background image

Operating Instructions RS cure 

 D cure 

 P cure 

 SHERAprint cure 

 3Decure

 

 

 

 

Rapid Shape GmbH 

 DOCR000251 

16 

 27 

 

3.

 

Remove all transport locks from the machine. 

4.

 

Make sure that the four feet of the machine are completely 

resting on the ground. 

 

4.3

 

Connecting 

4.3.1

 

Power Connection 

 

To make the power connection, please proceed as follows: 

1.

 

Prerequisite: The machine has already been set up. 

 

Chapter 4.2.2 

2.

 

Slide the cap of the power plug back until the stop and hold the 
cap in this position. Then insert the plug into the power 
connection of the machine. 

Pay attention to the positioning of the plug. The flat plug side 

must point inwards!

 

3.

 

Then, connect the power supply to the nearest outlet. Be careful 

not to trip over cables lying around. 

4.

 

Recommended: Connect a network cable to the Ethernet port on 

your machine and to your network interface. In this way, 

software updates can be installed automatically.

 

5.

 

Then switch on the machine. 

 Chapter 6.2 

 

4.3.2

 

Connect Protective Gas 

 

To make the protective gas supply, please proceed as follows: 

1.

 

Connect the hose from the protective gas supply to the gas 
connection on the back of the machine 

2.

 

Check that the specified inlet pressure is maintained. 

 

Chapter 10 

 

4.3.3

 

Connect to Other Machines 

 

The post curing unit can be connected to existing 3D printers in the 
surroundings. In this way, completed print jobs are sent from the 3D 

printer to the post curing unit and allow a curing process based on the 
print job submitted. 
To establish a connection between the post curing unit and the 3D 

printer, please use the ‚Settings’ menu item 

 

‚Set up connection with 

printer’.

 

 

Содержание RS cure

Страница 1: ...SHERAprint cure 3Decure Original Operating Instructions Rapid Shape GmbH Roemerstrasse 21 71296 Heimsheim Germany Phone 49 0 7033 309 878 0 info rapidshape de www rapidshape de Revision 14 05 2019 Ve...

Страница 2: ...lations and general safety regulations apply to the area of application of the machine Redistribution and duplication of this document utilisation and communication of its contents are strictly prohib...

Страница 3: ...sport 13 3 2 Transporting the Machine 13 3 3 Unpacking the Machine 13 3 4 Scope of Delivery 14 3 5 Storing the Machine 14 4 Installation 15 4 1 Installation Safety 15 4 2 Setting Up 15 4 2 1 Requireme...

Страница 4: ...intenance 23 8 2 Overview of the Cleaning Maintenance Work 23 8 2 1 Check Clean the Glass Bottom Seal 23 8 2 2 Check Clean Filter 24 8 2 3 Calibrate the LEDs 24 9 Disassembly Disposal 25 9 1 Safety In...

Страница 5: ...and signal word indicates a potentially dangerous situation which may lead to death or severe injury if not avoided CAUTION This combination of symbol and signal word indicates a potentially dangerou...

Страница 6: ...g beyond the intended use or otherwise is deemed to be improper The operator is exclusively liable for any resulting damage Use contrary to the intended use includes but is not limited to the followin...

Страница 7: ...ified electricians and in compliance with the relevant safety and VDE regulations Machines with damage to the power cord in sulation or lack of earthing must be disconnected from the mains immediately...

Страница 8: ...tall the machine in a closed cabinet Keep a minimum distance of 20 cm behind the machine so that the heat generated can be dissi pated without hindrance Environmental Conditions NOTE Material damage d...

Страница 9: ...sons working with the machine is obligated to check all safety devices and safety equipment regularly for their functionality Qualified Electricians Due to their professional training knowledge and ex...

Страница 10: ...ing materials 1 6 Environmental Protection ENVIRONMENTAL PROTECTION Danger to the environment through incorrect disposal of materials Incorrect disposal of not fully cured components and cleaning agen...

Страница 11: ...27 Rapid Shape GmbH DOCR000251 2 1 Machine Assembly Operating Elements Figure 1 Machine overview Lid Gas connection Shock absorber Air supply inlet Air outlet Glass bottom USB Ethernet connection Seal...

Страница 12: ...e SHERAprint cure 3Decure Rapid Shape GmbH DOCR000251 12 27 2 2 Serial Plate The serial plate is situated on the machine rear It shows the most important technical data and the serial number of the ma...

Страница 13: ...itten and image form and then immediately reported to the transport company and Rapid Shape Transport The machine can be transported by one person 1 Grasp the bottom of the transport packaging and tra...

Страница 14: ...ost curing unit Power supply Optionally additional accessories can be supplied For more information please contact Rapid Shape 3 5 Storing the Machine Store the machine in a dry dust free and frost pr...

Страница 15: ...ins voltage specified for the machine Only operate the machine with the power supply unit supplied The mains plug must be freely accessible at all times A complete separation of the machine from the m...

Страница 16: ...to trip over cables lying around 4 Recommended Connect a network cable to the Ethernet port on your machine and to your network interface In this way software updates can be installed automatically 5...

Страница 17: ...Operating Instructions RS cure D cure P cure SHERAprint cure 3Decure 17 27 Rapid Shape GmbH DOCR000251 In an emergency proceed as follows 1 Unplug the mains plug...

Страница 18: ...ceed as follows 1 Prerequisite The machine has already been fully connected Chapter 4 3 2 Turn the machine on using the power in off button The machine is started and performs a self test during start...

Страница 19: ...curing process is performed based on the print job submitted To start the process please proceed as follows 1 Prerequisites There is a connection between the post curing unit and the 3D printer Chapt...

Страница 20: ...s is shown on the display Figure 4 Selection of materials The exposure parameters e g the exposure time vacuum protective gas are selected based on the print job For safety reasons the machine should...

Страница 21: ...6 5 Check the Job After the cleaning and curing process check the component for the desired result 1 Open the lid 2 Remove the components 3 Close the lid 4 Check the components If you notice that the...

Страница 22: ...down will appear The machine counts for 10 seconds until the switch off happens automatically 3 Wait for the machine to shut down completely 4 Switch off the machine using the power on off button 7 2...

Страница 23: ...the Cleaning Maintenance Work Interval What How 1 Week Check glass bottom and seal Chapter 8 2 1 1 Month Vacuum filter Chapter 8 2 2 1 Month Calibrate LEDs Chapter 8 2 3 The cleaning and maintenance o...

Страница 24: ...Personnel Vacuum cleaner Operator For checking and vacuuming the filter cartridges in the machine please proceed as follows 1 Make sure the exposure chamber is empty 2 Open the lid The filter cartridg...

Страница 25: ...el Sufficient space must be ensured before the disassembly work begins Wear appropriate protective clothing Disassemble components properly Handle edged and pointed components carefully If necessary s...

Страница 26: ...ENVIRONMENTAL PROTECTION Incorrect disposal of electronic waste electronic components lubricants and other additives can be hazardous to the environment Therefore please dispose of machine components...

Страница 27: ...60 Ambient temperature C 15 to 40 Storage temperature C 15 to 70 Max humidity 70 All values are approximate 10 2 Dimensions Weight Width mm 230 Height mm 270 420 closed open Depth mm 380 Weight kg 12...

Отзывы: