background image

Operating Instructions RS cure 

 D cure 

 P cure 

 SHERAprint cure

 

 3Decure 

 

 

 

 

23 

 27 

Rapid Shape GmbH 

 DOCR000251 

 

 

8.1

 

Safety during Cleaning and Maintenance 

 

 

 

CAUTION! 
Risk of injury due to moving parts! 
The machine consists in part of accessible parts that can 
easily cause hand injuries through crushing or getting 
caught. 

 

When closing the machine, do not insert any 
fingers behind the shock absorbers and into the 
support area of the lid. 

 
 

 

 

NOTE! 
Material damage due to incorrect cleaning and 
maintenance! 
Observe the individual cleaning and maintenance steps 
to avoid material damage to the machine. 

 

8.2

 

Overview of the Cleaning & Maintenance Work 

 

 Interval 

 What 

 How 

 

 1 /Week 

 Check glass bottom 
 and seal 

 

 Chapter 8.2.1 

 

 1 /Month 

 Vacuum filter 

 

Chapter 8.2.2 

 

 1 /Month 

 Calibrate LEDs 

 

Chapter 8.2.3 

 
 

 

    

 

The cleaning and maintenance of the machine is an 
integral part of a properly functioning machine. It is 
therefore essential to observe the prescribed cleaning 
and maintenance work. 

 

 

8.2.1

 

Check & Clean the Glass Bottom & Seal 

 

Required accessories: 
 
Personnel: 

Microfibre cloth, glass cleaner/isopropanol, 
protective gloves 
Operator 

 

 

 

For checking and cleaning the glass bottom and the seal, please 
proceed as follows: 

1.

 

Put on protective gloves. 

2.

 

Open the lid. 

3.

 

Check the surrounding seal for soiling. Remove dirt with a 
microfibre cloth moistened with glass cleaner or isopropanol. 

4.

 

Check the glass bottom for soiling. Remove light dirt with a 

 

Содержание 3Decure

Страница 1: ...e SHERAprint cure 3Decure Original Operating Instructions Rapid Shape GmbH Roemerstrasse 21 71296 Heimsheim Germany Phone 49 0 7033 309 878 0 info rapidshape de www rapidshape de Revision 14 05 2019 Version 1 DOCR000251 EN ...

Страница 2: ...ulations and general safety regulations apply to the area of application of the machine Redistribution and duplication of this document utilisation and communication of its contents are strictly prohibited unless expressly permitted Any violations will result in a claim for damages After the editorial deadline of this documentation the product may have changed We expressly reserve the right to mak...

Страница 3: ...nsport 13 3 2 Transporting the Machine 13 3 3 Unpacking the Machine 13 3 4 Scope of Delivery 14 3 5 Storing the Machine 14 4 Installation 15 4 1 Installation Safety 15 4 2 Setting Up 15 4 2 1 Requirements for the Installation Location 15 4 2 2 Setting Up the Machine 15 4 3 Connecting 16 4 3 1 Power Connection 16 4 3 2 Connect Protective Gas 16 4 3 3 Connect to Other Machines 16 5 Emergency Shutdow...

Страница 4: ...aintenance 23 8 2 Overview of the Cleaning Maintenance Work 23 8 2 1 Check Clean the Glass Bottom Seal 23 8 2 2 Check Clean Filter 24 8 2 3 Calibrate the LEDs 24 9 Disassembly Disposal 25 9 1 Safety Instructions for Disassembly Disposal 25 9 2 Disassembling the Machine 25 9 3 Disposing the Machine 25 10 Technical Details 27 10 1 Operating Data 27 10 2 Dimensions Weight 27 10 3 Connections 27 10 4 ...

Страница 5: ...l and signal word indicates a potentially dangerous situation which may lead to death or severe injury if not avoided CAUTION This combination of symbol and signal word indicates a potentially dangerous situation which may lead to minor or slight injuries if not avoided NOTE This combination of symbol and signal word indicates a potentially dangerous situation which may lead to material damage if ...

Страница 6: ...ng beyond the intended use or otherwise is deemed to be improper The operator is exclusively liable for any resulting damage Use contrary to the intended use includes but is not limited to the following actions Operation within potentially explosive areas Operation with explosion hazardous printing materials Outdoor operation Operation in tropical climates Operation in wet damp rooms Operation wit...

Страница 7: ...lified electricians and in compliance with the relevant safety and VDE regulations Machines with damage to the power cord in sulation or lack of earthing must be disconnected from the mains immediately Repairs are to be made immediately Before starting work on active parts of the electri cal equipment and operating material make sure that it is de energised and secure for the duration of the work ...

Страница 8: ...stall the machine in a closed cabinet Keep a minimum distance of 20 cm behind the machine so that the heat generated can be dissi pated without hindrance Environmental Conditions NOTE Material damage due to environmental conditions Separate environmental conditions may result in property damage to the machine Protect the machine from moisture dripping water and splashing water Protect the machine ...

Страница 9: ...rsons working with the machine is obligated to check all safety devices and safety equipment regularly for their functionality Qualified Electricians Due to their professional training knowledge and experience as well as knowledge of the relevant standards and regulations electricians are able to carry out work on electrical systems and to recognise and avoid possible dangers independently The qua...

Страница 10: ...ging materials 1 6 Environmental Protection ENVIRONMENTAL PROTECTION Danger to the environment through incorrect disposal of materials Incorrect disposal of not fully cured components and cleaning agents can cause significant damage to the environment Dispose of all materials according to local waste disposal regulations Please take note of the safety data sheets of the respective materials ...

Страница 11: ... 27 Rapid Shape GmbH DOCR000251 2 1 Machine Assembly Operating Elements Figure 1 Machine overview Lid Gas connection Shock absorber Air supply inlet Air outlet Glass bottom USB Ethernet connection Seal Power connection Handle Serial plate Touch display Power on off button ...

Страница 12: ...re SHERAprint cure 3Decure Rapid Shape GmbH DOCR000251 12 27 2 2 Serial Plate The serial plate is situated on the machine rear It shows the most important technical data and the serial number of the machine Figure 2 Serial plate RS cure sample ...

Страница 13: ...ritten and image form and then immediately reported to the transport company and Rapid Shape Transport The machine can be transported by one person 1 Grasp the bottom of the transport packaging and transport it to the destination 2 Then unpack the machine Chapter 3 3 NOTE Do not turn over the transport packaging during transport This can lead to material damage to the machine 3 3 Unpacking the Mac...

Страница 14: ...Post curing unit Power supply Optionally additional accessories can be supplied For more information please contact Rapid Shape 3 5 Storing the Machine Store the machine in a dry dust free and frost protected room on a horizontal base with the lid closed ideally in the original packaging Also make sure the exposure chamber is empty Thoroughly clean the machine before storage ...

Страница 15: ...ains voltage specified for the machine Only operate the machine with the power supply unit supplied The mains plug must be freely accessible at all times A complete separation of the machine from the mains in an emergency by pulling out the power plug Chapter 5 Keep moisture away from live parts This may lead to short circuiting 4 2 Setting Up 4 2 1 Requirements for the Installation Location For t...

Страница 16: ... to trip over cables lying around 4 Recommended Connect a network cable to the Ethernet port on your machine and to your network interface In this way software updates can be installed automatically 5 Then switch on the machine Chapter 6 2 4 3 2 Connect Protective Gas To make the protective gas supply please proceed as follows 1 Connect the hose from the protective gas supply to the gas connection...

Страница 17: ...Operating Instructions RS cure D cure P cure SHERAprint cure 3Decure 17 27 Rapid Shape GmbH DOCR000251 In an emergency proceed as follows 1 Unplug the mains plug ...

Страница 18: ...oceed as follows 1 Prerequisite The machine has already been fully connected Chapter 4 3 2 Turn the machine on using the power in off button The machine is started and performs a self test during start up After completion of the self test the user interface Home screen is displayed 6 3 Equipping the Machine For equipping the machine please proceed as follows 1 Grasp the handle of the lid with one ...

Страница 19: ...e curing process is performed based on the print job submitted To start the process please proceed as follows 1 Prerequisites There is a connection between the post curing unit and the 3D printer Chapter 4 3 3 The exposure chamber is properly loaded Chapter 6 3 2 Go to Home screen 3 Select the Jobs tab 4 Select the respective print job 5 Press the Start button The curing process starts the current...

Страница 20: ...ss is shown on the display Figure 4 Selection of materials The exposure parameters e g the exposure time vacuum protective gas are selected based on the print job For safety reasons the machine should not be opened during the curing process If it is still opened the program aborts immediately 6 4 3 Operating Mode Custom In Custom mode you can create your own parameter sets For proper exposure of t...

Страница 21: ...1 6 5 Check the Job After the cleaning and curing process check the component for the desired result 1 Open the lid 2 Remove the components 3 Close the lid 4 Check the components If you notice that the curing result deviates from the desired result please repeat the workflow or contact Customer Service ...

Страница 22: ...tdown will appear The machine counts for 10 seconds until the switch off happens automatically 3 Wait for the machine to shut down completely 4 Switch off the machine using the power on off button 7 2 Shut Down the Machine for a Long Time 1 Month For the long term shutdown of the machine please proceed as follows 1 Switch off the machine Chapter 7 1 2 Disconnect the power supply 3 Store the machin...

Страница 23: ... the Cleaning Maintenance Work Interval What How 1 Week Check glass bottom and seal Chapter 8 2 1 1 Month Vacuum filter Chapter 8 2 2 1 Month Calibrate LEDs Chapter 8 2 3 The cleaning and maintenance of the machine is an integral part of a properly functioning machine It is therefore essential to observe the prescribed cleaning and maintenance work 8 2 1 Check Clean the Glass Bottom Seal Required ...

Страница 24: ... Personnel Vacuum cleaner Operator For checking and vacuuming the filter cartridges in the machine please proceed as follows 1 Make sure the exposure chamber is empty 2 Open the lid The filter cartridges of the upper part of the machine are located in the front panel below the touch display You can see it through the slot openings 3 Move the vacuum cleaner s suction tube along the slot openings Th...

Страница 25: ...nel Sufficient space must be ensured before the disassembly work begins Wear appropriate protective clothing Disassemble components properly Handle edged and pointed components carefully If necessary secure components so that they can not fall down during work In case of doubt please contact the Customer Service 9 2 Disassembling the Machine To disassemble the machine please proceed as follows 1 S...

Страница 26: ... ENVIRONMENTAL PROTECTION Incorrect disposal of electronic waste electronic components lubricants and other additives can be hazardous to the environment Therefore please dispose of machine components and auxiliary materials as intended via your waste disposal company or authorised specialist companies ...

Страница 27: ... 60 Ambient temperature C 15 to 40 Storage temperature C 15 to 70 Max humidity 70 All values are approximate 10 2 Dimensions Weight Width mm 230 Height mm 270 420 closed open Depth mm 380 Weight kg 12 All values are approximate 10 3 Connections Electrics V DC 24 Protective gas bar 1 0 1 5 Media WLAN LAN All values are approximate 10 4 Serial Plate Chapter 2 2 ...

Отзывы: