Maintenance 23
Maintenance
The Eastey L-Bar Sealer Tunnel Combo machine will provide many hours of
maintenance-free operation and requires very little maintenance for normal operation.
There are a few items that may require attention from time to time.
Attention!
Any maintenance beyond normal cleaning and lubrication
should only be performed by trained and qualified personnel.
Sealer
Daily
Clean the seal band.
Ensure the Teflon tape is not torn or missing on upper and lower seal areas.
Replace as needed.
Check conveyor belt for tears.
Check the conveyor height adjustment wheel. Lubricate chain and screws as
needed.
Check power cord and wiring for wear and loose connections.
Check for loose fasteners.
Shrink Tunnel
Daily
Inspect the silicone rollers. Repair or replace as needed.
Check mesh belt for material stuck on or in belt. Clean if necessary.
Monthly
Check and clean the air intake screens.
Check the airflow holes inside the tunnel for debris and clean if necessary.
Check and adjust the conveyor tension.
Lubricate the drive chains.
Содержание Eastey Value Series
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 29: ...Electrical Schematic 29 Electrical Schematic...
Страница 30: ...30 Electrical Schematic Electrical Schematic Continued...
Страница 31: ...Illustrated Parts List 31 Illustrated Parts List...
Страница 32: ...32 Illustrated Parts List...
Страница 33: ...Illustrated Parts List 33...
Страница 34: ...34 Illustrated Parts List...
Страница 35: ...Illustrated Parts List 35...
Страница 36: ...36 Illustrated Parts List...
Страница 37: ...Illustrated Parts List 37...
Страница 38: ...38 Illustrated Parts List...
Страница 39: ...Illustrated Parts List 39...
Страница 40: ...40 Illustrated Parts List...
Страница 41: ...Illustrated Parts List 41...
Страница 42: ...42 Illustrated Parts List...
Страница 43: ...Illustrated Parts List 43...
Страница 48: ......
Страница 49: ......