11.2.2 Start-Up the Gas Valve (All Gases)
11.2.2.1 Check Burner Gas Pressure (Single 
Stage)

1. Remove the plug in the outlet (burner) pressure 

test point and connect a pressure tap and a 
manometer. Page 31, Figure 13.

2. With the burner firing, measure the pressure on 

the manometer. To adjust the burner pressure, 
remove the regulator cover from the valve and 
turn the regulator adjustment screw to set the 
required burner pressure as stated in the 

Technical Data Table for the correct gas and 

model on Page 56, Section 16.3 and Page 58, 
Section 16.6.

11.2.2.2 Check Burner Gas Pressure (Two Stage)

1. Remove the plug in the gas valve outlet pres-

sure test point and connect a pressure tap and 
a manometer. See Page 31, Figure 14.

2. With the unit operating in high fire or low fire, 

measure the outlet pressure on the manometer. 
Measure burner pressure in both operating 
modes. To adjust the burner pressure, remove 
plastic cover from regulators and adjust High 
and/or Low regulators as needed. Required 
burner pressures are indicated in the Technical 
Data Table for the correct gas and model on 
Page 56, Section 16.3 and Page 58, Section 
16.6.

3. To set the high fire rate, adjust the high fire 

adjustment on the gas valve. To set the low fire 
rate (with the unit running in low fire), adjust the 
low fire adjustment on the gas valve.

11.2.2.3 Check Burner Gas Pressure 
(Modulating)

1. Loosen screw in outlet pressure tap shown on 

Page 32, Figure 15 and connect manometer. 
Gas pressure is NOT measured at Honeywell 
single stage gas valve.

2. With burner firing, measure pressure on 

manometer. To measure high fire burner 
pressure, disconnect modulating thermostat 
signal and apply 10 VDC to modulating input 
connections (polarity sensitive). To adjust high 
fire burner pressure, remove regulator cover 
from Honeywell single stage gas valve and turn 
regulator adjustment screw to set required 
burner pressure as stated in the Technical Data 

Table for the correct gas and model on Page 

56, Section 16.3 and Page 58, Section 16.6.

3. To measure low fire burner pressure disconnect 

10 VDC signal to modulating valve.

NOTE:

 Low fire burner pressure is set at factory and 

not field adjustable. (modulating)

NOTE:

 If the correct burner pressure cannot be 

reached, then check the inlet pressure to the valve 
with the burner firing. See Technical Data Table on 
Page 56, Section 1
6.3 and Page 58, Section 16.6 
for inlet pressure requirement.

Do not continue to adjust the regulator if the 
pressure is not changing.

If the inlet pressure is too low to allow correct burner 
pressure setting, then the gas inlet pressure must be 
corrected before completing the start-up. 

11.2.2.4 Check Gas Rate (Single and Two Stage)

1. After burner pressure adjustment, allow the 

heater to operate for at least 15 minutes and 
then re-check settings. Adjust pressure setting 
if necessary.

2. Check gas flow rate at gas meter.

NOTE

: For two stage valve (High/Low 

operation) check gas flow in both operating 
modes.

3. Turn off heater and electrical supply.

4. Remove the manometer and refit all covers to 

the valve and tighten the screw of the outlet 
pressure tap.

11.2.2.5 Check Gas Rate (Modulating)

1. After burner pressure adjustment, allow heater 

to operate for at least 15 minutes and then re-
check settings. Adjust pressure setting if neces-
sary.

2. Check high/low fire gas flow rate at gas meter. 

To place heater into high fire, disconnect 

modulating thermostats signal and apply 10 

VDC to modulating input connections.

3. To place heater into low fire, disconnect 10 

VDC from modulating input connections.

4. Turn off heater and electrical supply.

5. Remove manometer, tighten outlet pressure tap 

screw and replace modulating thermostat 
signal wires.

Содержание UHAT 150

Страница 1: ...done by a contractor qualified in the installation and service of gas fired heating equipment or your gas supplier Improper installation adjustment alteration service or maintenance can result in deat...

Страница 2: ......

Страница 3: ...n respect de ces instructions peut entra ner la mort des blessures corporelles ou des dommages mat riels ATTENTION L installation doit tre effectu e par un installateur prouv contractant qualifi dans...

Страница 4: ......

Страница 5: ...Series Internal Wiring Diagram for Single Stage Gas Valves 22 10 4 UHA X S Series Ladder Wiring Diagram for Single Stage Gas Valves 23 10 5 UHA T X S Series Internal Wiring Diagram for Two Stage Gas...

Страница 6: ...16 4 Dimension Data for Models UHA T M X S 300 400 57 16 5 General Technical Data Table 58 16 6 Technical Data Table 58 SECTION 17 The RAPID UHA Series Warranty 59...

Страница 7: ...rtical and Horizontal Vent Termination Separated Combustion Heater 16 Figure 11 Gas Connection 19 Figure 12 Automatic Burner Control Sequence 30 Figure 13 Single Stage Gas Valve for Models UHA X S 150...

Страница 8: ......

Страница 9: ...and operated under the general concepts of reasonable use and installed using the best building practices This equipment is not intended for use by persons including children with reduced physical sen...

Страница 10: ...y Description Part Number Logo Label 91031102 Cut Hazard Label 91010430 Vent Length Label 91039505 Vent to Outdoors Label 91010427 Warning Label 91010429 Rating Plate Label 91010418 Installation Label...

Страница 11: ...ber Logo Label 91031102 Cut Hazard Label 91010430 Vent Length Label 91039505 Vent to Outdoors Label 91010427 Warning Label 91010429 Rating Plate Label 91010418 Installation Label 91010431 Instruction...

Страница 12: ...033 is illustrated on the back cover Know your model number and installed configuration Model number and installed configuration are found on the heater serial plate and throughout the Installation Op...

Страница 13: ...ndoors Must be installed in a level position with horizontal discharge May be mounted on a shelf of non combustible material May be suspended from above See Page 9 Figure or from wall brackets of suff...

Страница 14: ...inity of this heater The stated clearances to combustibles represents a surface temperature of 90 F 50 C above room temperature Building materials with a low heat tolerance such as plastics vinyl sidi...

Страница 15: ...rs may be mounted at a higher level if destratification fans are installed For Models UHA 150 400 venting directly from top of heater is not applicable For roof terminal vent elbow duct off back of he...

Страница 16: ...ision Canada Refer to Natural Gas and Propane Installation Code Standard CSA B149 1 latest revision 5 4 Electrical The heater must be electrically grounded in accordance with the following codes Unite...

Страница 17: ...lines must not be used to support the heater Do not locate the gas or electrical supply lines directly over the path of the flue products from the heater The heater must be installed in a location th...

Страница 18: ...r that can be opened in any building any non mechanical air supply inlet to any building or of the combustion air inlet of any other piece of equipment 7 2 Vent Installation Maintain clearances to com...

Страница 19: ...ed at the roof or wall penetration instead of a thimble Ensure vent manufacturer s clearance from vent material is maintained Seal annular space of the type B 1 vent as well as all joints in the remai...

Страница 20: ...gas fired equipment or your local gas supplier If the venting must be resized use appropriate tables in US Appendix G of NFPA 54 ANSI Z223 1 latest revision National Fuel Gas Code US or Standard CSA B...

Страница 21: ...al Option Horizontal Option Vent 90 Bend 12 31 cm Minimum from roof to vent termination Vent Termination Listed thimble through combustible wall Flashing By Others 12 31 cm Minimum from wall to vent t...

Страница 22: ...ositioned to avoid direct opposition between streams of combustion gases Roof 2 6 m Minimum Type B vent cap 7 18 cm or 8 20 cm may be used These are not available from the manufacurer Roof Flashing Ap...

Страница 23: ...0 400 5 13 cm 90502105 4 10 cm Single Wall Vent Pipe By Others Seal joint between single wall and Type B vent with silicone sealant Use 3 sheetmetal screws equally spaced around joint Use 3 sheetmetal...

Страница 24: ...m Collar By Others Attach with 3 sheet metal screws 12 31 cm Minimum from roof to combustion air terminal Flashing By Others 12 31 cm Minimum from wall to combustion air terminal Description Part Numb...

Страница 25: ...de Combustion Air Supply If outside combustion air supply is required separated combustion model UHA T M X S heaters must be used Caution If the building has a slight negative pressure or corrosive co...

Страница 26: ...included in the layout drawing contact the local gas supplier An isolating valve and union connection should be used and fitted into the supply adjacent to the heater A minimum 1 8 NPT plugged tapping...

Страница 27: ...Heavy Gauge Pipe Gas Connector Option A Stainless Steel Flexible Gas Connector Do not twist flexible gas connector Ensure all joints are gas tight CAUTION Hold gas nipple securely with pipe wrench whe...

Страница 28: ...m thermostat should be mounted on a vibration free wall or column at a height of approximately 5 1 5 m from the floor to measure the ambient temperature It should be clear of both cold drafts and the...

Страница 29: ...SECTION 10 WIRING 21 of 59 10 2 Low Voltage Thermostat for Models UHA T M X S 150 400 NOTE Models 300 400 have two axial fans NOTE Electrical supply is located below terminal strip...

Страница 30: ...agram for Single Stage Gas Valves NOTE For field wiring into service junction box or if any of the original wire supplied with the heater must be replaced it must be replaced with wiring material havi...

Страница 31: ...Valves NOTE For field wiring into service junction box or if any of the original wire supplied with the heater must be replaced it must be replaced with wiring material having a temperature rating of...

Страница 32: ...ge Gas Valves 1 W2 HIGH LOW CONTROL HIGH LOW COMMON NOTE For field wiring into service junction box or if any of the original wire supplied with the heater must be replaced it must be replaced with wi...

Страница 33: ...s HIGH STAGE NOTE For field wiring into service junction box or if any of the original wire supplied with the heater must be replaced it must be replaced with wiring material having a temperature rati...

Страница 34: ...Diagram for Modulating Gas Valves NOTE For field wiring into service junction box or if any of the original wire supplied with the heater must be replaced it must be replaced with wiring material havi...

Страница 35: ...lves NOTE For field wiring into service junction box or if any of the original wire supplied with the heater must be replaced it must be replaced with wiring material having a temperature rating of at...

Страница 36: ...LLATION OPERATION AND SERVICE MANUAL 28 of 59 10 9 Electrical Connection to the Heater Note Junction box is not provided with heater Conduit can also be attached directly to heater with wire junction...

Страница 37: ...gas installation including the gas meter must be inspected tested for gas tightness and purged in accordance with local and national codes Ensure that the air is fully purged from the heater inlet pi...

Страница 38: ...ure 12 There will be no ignition of the burner and lockout will occur which proves the controls are operating correctly Figure 12 Automatic Burner Control Sequence Burner Sequence for Ignition Control...

Страница 39: ...Inlet I l t P TOP VIEW END VIEW Description Part Number Gas Valve 150 250 NG 90032505 Gas Valve 150 250 LP 90032506 Gas Valve 300 400 NG 90032520 Gas Valve 300 400 LP 90032521 PSI IN C ON OFF LO HI Re...

Страница 40: ...f 59 Figure 15 Modulating Gas Valve for Models UHA M X S 150 400 Description Part Number Gas Valve 150 250 NG 90032505 Gas Valve 150 250 LP 90032506 Gas Valve 300 400 NG 90032520 Gas Valve 300 400 LP...

Страница 41: ...ve To adjust high fire burner pressure remove regulator cover from Honeywell single stage gas valve and turn regulator adjustment screw to set required burner pressure as stated in the Technical Data...

Страница 42: ...ater for service or during off season 11 5 External Controls External controls may include time switch interlock switch room thermostat and frost thermostat Operate each control to ensure that they fu...

Страница 43: ...ely The fan will continue to run for 90 seconds To restart turn the thermostat on or above room temperature 12 3 Simple Troubleshooting Some possible reasons for the heater not operating are 1 Gas sup...

Страница 44: ...AULT MODE Slow Flash Normal Operation No call for heat Fast Flash Normal Operation Call for heat 2 Flashes Ignition Lockout No flame detected 3 Flashes Airflow Fault Pressure switch open or closed 4 F...

Страница 45: ...2 Remove the filler panel 10 screws to fully access the burner assembly See Page 47 Section 15 2 1 3 Remove burner assembly from cabinet via six screws See Page 47 Section 15 2 1 Electrode and flame p...

Страница 46: ...take components to ensure they are in good condition gas tight and corrosion free 13 8 Maintenance Checklist Installation Code and Annual Inspections All installations and service of RAPID equipment m...

Страница 47: ...ow Make sure it is clean and free of cracks or holes Clean and replace as required Flue Blower Scroll Wheel and Motor Compressed air or a vacuum cleaner may be used to clean dust and dirt Inshot Burne...

Страница 48: ...ION OPERATION AND SERVICE MANUAL 40 of 59 Wall Tag If a wall tag is present make sure it is legible and accurate Please contact Rapid Engineering LLC or your RAPID independent distributor if you need...

Страница 49: ...e to follow these instructions can result in death electric shock injury or property damage Burn Hazard Allow heater to cool before service Tubing may still be hot after operation Explosion Hazard Tur...

Страница 50: ...UHA STANDARD UNIT HEATER INSTALLATION OPERATION AND SERVICE MANUAL 42 of 59 14 1 General...

Страница 51: ...14 2 Troubleshooting For Automatic Ignition Burner Systems For your safety and optimum heater performance use only replacement parts sold and supplied by Rapid Engineering LLC Conduct start up proced...

Страница 52: ...r or replace as required Is inlet burner gas pressure correct Is live and neutral polarity correct Is flame probe circuit correct Is there a current flowing in the flame probe circuit with no flame pr...

Страница 53: ...valve rise when valve turns on No Yes Is gas pressure at inlet of the valve correct for gas type Note pressure found No Yes START If problems persist contact Rapid Engineering LLC at www rapidenginee...

Страница 54: ...ECT GAS VALVE IS USED WHEN REPLACING THESE CONTROLS Carbon Monoxide Hazard WARNING Use only genuine RAPID replacement parts per this installation operation and service manual Failure to follow these i...

Страница 55: ...ent with Hinged Door Removed Before burner removal remove the 10 screws holding the filler panel on and remove the filler panel NOTE Models UHA 300 400 have two axial fans Side View of Burner Compartm...

Страница 56: ...rifice Quantity 7 8 9 10 11 12 14 14 Natural Gas Orifice Marking 43 43 2 25 mm 2 25 mm 2 25 mm 43 43 40 P N 91930043 91930043 91930225 91930225 91930225 91930043 91930043 91930040 Propane Orifice Mark...

Страница 57: ...Burners UHA T M X S 200 92000000 9 Inshot Burners UHA T M X S 225 92000000 10 Inshot Burners UHA T M X S 250 92000000 11 Inshot Burners UHA T M X S 300 92000000 12 Inshot Burners UHA T M X S 350 92000...

Страница 58: ...de of aluminized steel 409 stainless steel The tube supports are made of aluminized steel 409 stainless steel 15 5 Louvers and Louver Spring The louvers for standard range models UHA T M X S 150 UHA T...

Страница 59: ...ng an flue blower See Page 29 Section 11 MODEL UHA T M X S 150 300 Flue Blower P N 90710403 Remove screws securing outlet flange to the flue adapter Refit in reverse order Disconnect electrical connec...

Страница 60: ...402 Vent Box Outlet Gasket Flue Blower Vent Box screws Flue Adapter Flue Adapter to Flue Blower screw Rear Panel Hole Disconnect electrical connections at plug in tabs Mounting Plate to Vent Box screw...

Страница 61: ...s supplied completely assembled and balanced Carbon Monoxide Hazard Use correct pressure switch specified for each model Use of incorrect pressure switch or disabling pressure switch circuit could cau...

Страница 62: ...ly genuine replacement parts sold and supplied by Rapid Engineering LLC 15 11 Limit Switches 15 11 1 Removal and Replacement 1 Remove the electrical connections to the switch 2 Unscrew the two screws...

Страница 63: ...25 5 64 8 25 5 64 8 D in cm 17 6 44 7 17 6 44 7 17 6 44 7 17 6 44 7 17 6 44 7 E in cm 19 4 49 3 19 4 49 3 19 4 49 3 19 4 49 3 19 4 49 3 F in cm 30 0 76 2 30 0 76 2 32 0 81 3 32 0 81 3 32 0 81 3 G in c...

Страница 64: ...1 40 1 40 1 Weight Net lbs kg 217 98 4 237 107 5 255 115 7 265 120 2 270 122 5 Model UHA T M X S 150 UHA T M X S 175 UHA T M X S 200 UHA T M X S 225 UHA T M X S 250 Total Input High Fire Btu h x 1000...

Страница 65: ...SECTION 16 SPECIFICATIONS 57 of 59 16 4 Dimension Data for Models UHA T M X S 300 400...

Страница 66: ...7 N in cm 6 5 16 5 6 5 16 5 6 5 16 5 Model UHA T M X S 300 UHA T M X S 350 UHA T M X S 400 Full Load Amps 120 V A 11 6 11 6 11 6 Air Volume CFM 4663 4663 4663 Flue and Air Intake Flue Intake Size in...

Страница 67: ...ta plate and or serial number are removed defaced modified or altered in any way The ownership of the RAPID UHA Series is moved or transferred This warranty is nontransferable Rapid Engineering LLC is...

Страница 68: ......

Страница 69: ......

Страница 70: ......

Страница 71: ......

Страница 72: ......

Отзывы: