SECTION 6: M
AJOR
C
OMPONENTS
11 of 91
SECTION 6: MAJOR COMPONENTS
FIGURE 13: Major Component Descriptions
Tube and Reflector Hanger
with Clamp Package
Position this hanger no more
than 4'' (10 cm) a
w
ay from
the b
u
rner.
Coupling Assembly
with Lock
Reflector End Cap
P
u
nch o
u
t center section to
accommodate t
u
be.
Tube and Reflector Hanger
S
u
spend system from these
hangers.
Flex Gas Line
with Shut Off Cock
Burner Tube
S
u
pplied in 10' (3 m) lengths.
B
u
rner t
u
be is al
w
ays the first
t
u
be after the b
u
rner.
Reflector Support
Strap & Wire Form
Turbulator
T
u
rb
u
lator m
u
st be installed in the last standard section
of t
u
be.T
u
rb
u
lator is only req
u
ired on the CTHN-40, 60
and 80. For installation,
EP-100 Pump Package -
For more information, refer to the
EP-100 Installation, Operation and
Service Man
u
al
(P/N 127201NA).
EP-201 Pump Package -
For more information, refer to the
EP-200 Series Installation,
Operation and Service Man
u
al
(P/N 127200NA).
Fan Assembly
EP-300 Series
P
u
mp Package -
For more information,
refer to the EP-300
Series Installation,
Operation and
Service Man
u
al
(P/N 127202NA).
Reflector (Aluminum or Stainless Steel)
Alternate overlap as sho
w
n
Minim
u
m overlap is 6'' (16 cm).
Tube
Hot rolled or heat treated al
u
minized
t
u
be s
u
pplied in 10' (3 m) lengths.
Burner with
Tube Gasket
M
u
st be installed
w
ith the flame
observation
w
indo
w
facing do
w
n.
Restrictor Plate
Used at fan assembly inlet
for
u
nitary heaters only.
See fan assembly belo
w
.