GUI Reference
R&S
®
ZNC
237
User Manual 1173.9557.02 ─ 13
Step 2: Connections
Defines the port assignment(s) between the R&S ZNC and the calibration unit.
Access:
CHANNEL > CAL > Start Cal > Start... (Cal Unit) > Next
Cal Type / Ports
Displays the automatic calibration to be performed, identified by its calibration type and
calibrated ports.
Remote command:
The port parameters in many calibration commands define the calibrated ports.
Cal Unit / Port Assignments
Displays the port assignment and allows to edit it.
Detect Port Assignment
Starts a procedure by which the R&S ZNC (with a little help from the attached calibration
unit) auto-detects the connected ports. The automatic assignment replaces the config-
ured one.
In case auto-detection fails
●
an error report is shown as a warning dialog
●
the undetected port connections are overlayed by warning signs
●
the calibration may be invalid
Channel Settings