Risk of instrument damage during operation
An unsuitable operating site or test setup can cause damage to the instrument and to
connected devices. Ensure the following operating conditions before you switch on the
instrument:
●
All fan openings are unobstructed and the airflow perforations are unimpeded. The
minimum distance from the wall is 10 cm.
●
The instrument is dry and shows no sign of condensation.
●
The instrument is positioned as described in the following sections.
●
The ambient temperature does not exceed the range specified in the data sheet.
●
Signal levels at the input connectors are all within the specified ranges.
●
Signal outputs are correctly connected and are not overloaded.
Risk of electrostatic discharge (ESD)
Electrostatic discharge (ESD) can cause damage to the electronic components of the
instrument and the device under test (DUT). ESD is most likely to occur when you con-
nect or disconnect a DUT or test fixture to the instrument's test ports. To prevent ESD,
use a wrist strap and cord and connect yourself to the ground, or use a conductive
floor mat and heel strap combination.
For details refer to the basic safety instructions included at the front of the manual.
2.3.1 EMI Suppression
Electromagnetic interference (EMI) may affect the measurement results.
To suppress generated Electromagnetic Interference (EMI),
●
Use suitable shielded cables of high quality. For example use double-shielded RF
and LAN cables.
Note:
USB cables are of varying and often poor quality. Therefore, check the qual-
ity of each individual USB cable as described in the service manual.
●
Always terminate open cable ends.
●
Use the cable R&S SMU-Z6 for connection to the DIG I/Q interfaces of the instru-
ment. The required cable is available under part number 1415.0201.02.
●
Note the EMC classification in the data sheet
Putting into Operation
Содержание SMJ100A
Страница 34: ...Preface R S SMJ100A 18 Operating Manual 1403 7458 32 14 Notes on Screenshots...
Страница 86: ...Preparing for Use R S SMJ100A 70 Operating Manual 1403 7458 32 14 LXI Configuration...
Страница 139: ...Manual Operation R S SMJ100A 123 Operating Manual 1403 7458 32 14 Legend of Front Panel Controls...
Страница 140: ...Manual Operation R S SMJ100A 124 Operating Manual 1403 7458 32 14 Legend of Front Panel Controls...
Страница 454: ...Instrument Function R S SMJ100A 438 Operating Manual 1403 7458 32 14 Baseband Signal Baseband Block...
Страница 826: ...Remote Control Commands R S SMJ100A 810 Operating Manual 1403 7458 32 14 UNIT Subsystem...
Страница 828: ...Maintenance R S SMJ100A 812 Operating Manual 1403 7458 32 14 Storing and Packing...
Страница 843: ...Hardware Interfaces R S SMJ100A 827 Operating Manual 1403 7458 32 14 Figure A 2 BERT circuit diagram BERT Connector...
Страница 844: ...Hardware Interfaces R S SMJ100A 828 Operating Manual 1403 7458 32 14 BERT Connector...