1 Putting into Operation
This section describes the basic steps to be taken when setting up the R&S
NRP2 for
the first time.
It contains the following topics:
●
unpacking
●
AC supply connection
●
switching the meter on and off
●
function testing and installing the meter
●
preset or default settings
●
front and rear views
1.1 Notes on putting into operation
Risk of instrument damage
Note that the general safety instructions also contain information on operating conditions
that will prevent damage to the instrument. The instrument's data sheet may contain
additional operating conditions.
Risk of instrument damage
Before putting the R&S
NRP2 into operation, make sure that:
●
the sensor inputs are not overloaded
●
the meter’s outputs are not overloaded or wrongly connected
●
the ventilation holes are not obstructed
The meter may be damaged if these precautions are not observed.
Notes on putting into operation
Содержание NRP2
Страница 1: ...R S NRP2 Power Meter User Manual User Manual 2 1173 9157 02 03 Test Measurement...
Страница 20: ......
Страница 24: ...Contents R S NRP2 6 User Manual 1173 9157 02 03...
Страница 40: ...Putting into Operation R S NRP2 22 User Manual 1173 9157 02 03 Starting the R S NRP2...
Страница 66: ...Getting Started R S NRP2 48 User Manual 1173 9157 02 03 Measuring average burst power Burst Av mode...
Страница 352: ...Maintenance R S NRP2 334 User Manual 1173 9157 02 03 Storage...
Страница 366: ...Error Messages and Troubleshooting R S NRP2 348 User Manual 1173 9157 02 03 Bootmenu...
Страница 382: ...Remote control interfaces R S NRP2 364 User Manual 1173 9157 02 03 USB interface...
Страница 394: ...Standard Configurations R S NRP2 376 User Manual 1173 9157 02 03...
Страница 418: ...Programming Measurements R S NRP2 400 User Manual 1173 9157 02 03 Optimization of measurement speed...
Страница 422: ...Compatibility Information R S NRP2 404 User Manual 1173 9157 02 03...