1xEV-DO Signaling
R&S
®
CMW-KG8xx/-KM8xx/-KS8xx
34
User Manual 1173.9511.02 ─ 11
The state of the signaling application can be observed from within the "RX measure-
ment" view:
The "1xEV-DO RX measurement" results are displayed in a tabbed style.
2.2.14.1
Test Procedures
PER / throughput RX measurement procedure
1. ● To evaluate the AT's receiver quality, select the "Forward" test application;
● To evaluate the AT's transmitter quality
–
select the "Reverse" test application to test without simultaneous forward
link traffic
–
select the "Forward & Reverse" test application lo let the AT process for-
ward link traffic at the same time
2. Connect your access terminal and establish a connection; wait until the R&S
CMW
has entered the "Connected" state. For details refer to
chapter 2.2.2, "Initiating Sig-
3. Use the "1xEV-DO <i> RX Meas" shortcut softkey to call the RX measurement
application
4. Selectively enable and start the packet error rate and/or throughput measurement.
5. Wait until the R&S
CMW has sent/received the test data and read the results from
the appropriate views.
Checks in case of failed FL PER tests
If forward link PER measurements yield excess error rates, check the FTAP/FETAP/
FMCTAP "ACK Channel" setting that can be performed under
●
●
●
on page 88 for revision B
"Not Used" is recommended for PER tests.
Data RX measurement procedure
1. ● Set up an end-to-end data connection as described in
2. Use the "1xEV-DO <i> RX Meas" shortcut softkey to call the measurement applica-
tion
3. Activate the "Data" tab and start the measurement.
General Description
深圳德标仪器
135-1095-0799