background image

Copyright 2007-2016, Auber Instruments Inc. All Rights Reserved.  

No part of this manual shall be copied, reproduced, or transmitted in any way without the prior, written consent of Auber Instruments. Auber Instruments retains the exclusive rights to all information included in this 

document.

 

Supplemental

 

Installation

 

Guide

 

for

 

Silvia

 

E

 

KIT

RSRTDNb

 

(April

 

2016)

 

 

This

 

is

 

a

 

supplemental

 

guide

 

for

 

Rancilio

 

Silvia

 

E,

 

released

 

on

 

the

 

winter

 

of

 

2015

 

for

 

European

 

market.

 

Since

 

the

 

changes

 

of

 

Silvia

 

E

 

are

 

very

 

limited

 

from

 

Silvia

 

V4,

 

this

 

guide

 

only

 

cover

 

the

 

installation

 

steps

 

that

 

need

 

to

 

be

 

adjusted

 

due

 

to

 

these

 

changes.

  

The

 

only

 

difference

 

is

 

that

 

the

 

tapping

 

of

 

power

 

is

 

different.

 

The

 

main

 

power

 

switch

 

of

 

the

 

Silvia

 

E

 

has

 

changed

 

from

 

the

 

original

 

mechanical

 

ON/OFF

 

switch

 

to

 

a

 

push

 

button

 

reset

 

switch.

 

Therefore,

 

we

 

have

 

to

 

tap

 

the

 

power

 

from

 

the

 

brew

 

switch.

 

 

User

 

should

 

still

 

use

 

“KIT

RSRTDN

 

Installation

 

guide

 

V2.2”

 

as

 

the

 

main

 

installation

 

guide.

  

 

1.

 

Tapping

 

the

 

Power

 

to

 

the

 

Controller

 

Replace

 

the

 

original

 

brew

 

thermostat

 

with

 

the

 

RTDStat

 

(pointed

 

by

 

the

 

blue

 

arrow

 

in

 

Figure

 

1).

 

Then

 

we

 

will

 

tap

 

two

 

cables

 

on

 

the

 

brew

 

switch

 

(pointed

 

by

 

green

 

arrows

 

in

 

Figure

 

1)

 

to

 

supply

 

power

 

to

 

the

 

controller.

 

The

 

green

 

arrows

 

point

 

to

 

a

 

red

 

and

 

a

 

black

 

cable

 

connected

 

to

 

the

 

lower

 

two

 

blades

 

on

 

the

 

brew

 

switch.

  

 

 

Figure

 

1.

 

Cables

 

need

 

to

 

be

 

tapped

 

are

 

pointed

 

by

 

green

 

arrows.

 

 

First,

 

remove

 

all

 

four

 

cables

 

on

 

the

 

brew

 

switch.

 

Connect

 

the

 

two

 

black

 

cables

 

with

 

piggyback

 

connectors

 

to

 

the

 

red

 

and

 

black

 

cable

 

removed

 

from

 

the

 

brew

 

switch.

  

Отзывы: