FinM
Deployment
Guide
Release
4.5.10
2
‐
8
TBS
Mounting
Site
Installation
Vertical
pole
‐
medium
1. Diameter
2
to
3:
Before
raising
the
TBS
on
the
pole,
position
the
pole
clamp
as
shown
in
the
following
two
figures.
Do
not
completely
tighten
the
bolts:
2. Place
this
assembly
on
the
pole
where
you
want
to
mount
the
TBS.
Once
it
is
in
place,
rotate
the
pole
clamp
as
shown,
then
tighten
both
bolts.
Vertical
Pole
‐
thick
1. Diameter
larger
than
3:
Use
worm
drive
clamps
(not
supplied),
threaded
through
the
holes
as
shown
in
,
or
U
‐
bolts
(not
supplied),
fastened
using
the
holes
as
shown
in
Figure
2
‐
9:
Medium
pole:
Fasten
clamp
to
base
plate
Figure
2
‐
10:
Medium
pole:
Do
not
com
‐
pletely
tighten
bolts
Figure
2
‐
11:
Medium
pole:
Rotate
clamp
Figure
2
‐
12:
Medium
pole:
tighten
bolts
Содержание Transportation FiberinMotion
Страница 1: ...DEPLOYMENT GUIDE TRANSPORTATION FIBERINMOTION BROADBAND TRAIN TO GROUND COMMUNICATION Release 4 5 10...
Страница 5: ...FinM Deployment Guide Release 4 5 10 iv...
Страница 51: ...FinM Deployment Guide Release 4 5 10 2 38 TMU Mounting Site Installation Figure 2 65 TMU PoE drawer contents...
Страница 122: ...FinM Deployment Guide Release 4 5 10 F 1...