5. INSTALLATION INSTRUCTION OF WTC/4…C../EX
●
For WTC/4…C../EX platform scales prepare an appropriate place for installation.
It should be dry, even and rigid. Acceptable operation temperature range -10°C to
+40°C.
The ground on which the platform is to be placed must be able to carry the maximal
load together with the platform.
○
WTC/4…C../EX scales are equipped in the indicator connected via ~3m cable.
The indicator can be mounted on the table or installed on a wall by means of a
handler.
●
Scale should be unpacked outsider the hazardous area..
NOTICE !!
Equipotentialisation is required for the indicator.
The earthing wire should be connected to the terminal marked by „ ” .
●
Before moving the scale to the place of operation prepare an earthing wire. This
wire should be terminated with an eye and should be screwed to the indicator using M4
nut. Use tooth lock washer to assure a constant force of holding down.
The equipotentialisation wire should be of yellow-green colour and minimal cross-
section of 4mm².
●
Install the device to the please of operation in the hazardous areas.
NOTICE!
Installing the platform and the indicator should be performer when the
appearance of the explosive atmosphere is impossible.
- 9 -
Содержание WTC/4 3000 C8/EX
Страница 2: ...2 JULY 2007...
Страница 46: ...46 Technical Documentation ZRi02 Power Supplier...
Страница 52: ...27 DECLARATION OF CONFORMITY AND CERTIFICATES 52...
Страница 53: ...53...
Страница 54: ...54...
Страница 55: ...55...
Страница 56: ...56...
Страница 57: ...57...