7. Boiler start-up and maintenance
The first commissioning of the boiler should be performed by a technician certified by Radijator
Inženjering. Training the boiler user is mandatory.
In this way, this person is authorized to notify the customer service in the factory about the time when
the boiler started its operation and the condition of the boiler at its first firing, while keeping a copy of
the report on the commissioning of the boiler. Warranty and instruction manual are given to the
customer. One copy of the warranty is sent to the manufacturer.
If the warranty has not been filled in, it is not valid.
Only the boilers commissioned by the authorised technician are subject to the warranty conditions.
The following text is intended for the user of the boiler, as a reminder, to be able to start up the boiler
on their own, should they turn off the boiler (e.g. for cleaning).
Parameters related to the boiler operation, which are available to the user, are on the display.
The remaining parameters which are found in the so-called hidden menu should not be changed
without the consent of the technician who commissioned the boiler or the factory itself.
7.1 LCD 100 display
7.1.1 Introduction
The main screen shows:
1
Combustion power;
2
Combustion recipe;
3
Current temperature of water in the boiler;
4
Set temperature of water in the boiler;
5
Status or error in the work of the system;
6
Functional state of the boiler;
7
Date and time;
8
Chrono is activated.