10. Start of boiler operation and cleaning
First Commissioning of the boiler is performed by a Technician who has a
Certificate issued by the “Radiator engineering” Co. Training of boiler users is
mandatory.
In this way, the person is authorized to notify the customer service in the factory,
time when the boiler started its operation in the condition of the boiler at its first
firing, while a copy of the commissioning of the boiler in operation is retained.
Guarantee and instruction manual are given to the customer. One copy of
Guarantee is sent to the manufacturer.
If the guarantee is not filled in, it is not valid.
Only boilers that are operated only by authorized persons subject to technical
conditions of complete guarantee of two years.
The following text is intended for the user of the boiler, as a kind of reminder, that
if you turn off the boiler (e.g. for cleaning) will be able to independently run the
boiler.
The parameters related to the operation of the boiler and which are available to the
user on the display. Other parameters that are called hidden menu should not be
changed without the approval of the technical person who has put the boiler into
operation or the factory.