2. FIRST START-UP
SUPPOR
T
C
ENTRE
2.1.2. BOILER COMMISSIONING
WARNING
Make sure that the system is correctly
filled.
Proceed with boiler commissioning as follows:
› Power the boiler.
› Open the gas tap.
› Use the ‘
’ button to select the HEATING
ONLY operation mode. With the '
' symbol
displayed and a static signal on the display, the
function is activated.
› The burner will start as soon as the thermostat
contact is closed;
› if the flame is missing the board will repeat the
start-up operations after post-ventilation (30
seconds).
› You might have to repeat the start-up operation
several times to release all air inside the gas
tube. Before repeating the operation, wait at
least 5 seconds from the last start-up attempt
and unlock the boiler from “E01” error code by
pressing the Reset ‘