Radiant R2K 55 Скачать руководство пользователя страница 66

66

R2K 55 - RAD - ING - Inst.Manual - 2002.1_CSA

2.    MAINTENANCE

SUPPOR

T CENTER

2.2.18. CONVERSION TO A 

DIFFERENT GAS TYPE

 ATTENTION

Make sure that the gas induction tube is 

suitable for the new type of fuel with which the boiler 
is supplied.

 › loosen  the  two  screws  ‘1’  (fig.41)  from  the 

fastening bush, and remove the air suction tube;

 › unscrew  the  tube  coupling  that  connects  the 

gas valve to venturi;

 › unscrew the three fastening screws ‘2’ (fig.41) of 

the venturi  ‘V’ (fig.41) using a 10 key, as shown 
in figure 42;

 › remove  the  two  screws  ‘3’  (fig.43)  and  apply 

pressure on the rear side of venturi ‘C’ (fig.43);

 › replace  the  body  venturi  with  the  one  suitable 

for  the  type  of  supply  gas  (cod.  30-00230  for 
NATURAL GAS / cod. 30-00229 for PROPANE)  
and make sure the tooth ‘D’ (fig.43) is adjusted 
downwards  on  the  aluminium  ring  nut  (see 
fig.43);

 › remount  the  components  following  the 

demounting operations in reverse making sure 
that  gasket  ‘G’  is  re-assembled  as  shown  in 
fig.41;

 › set  the  boiler  to  operate  with  the  new  type  of 

gas,  changing  the  value  of  the  parameter  P02 
‘GAS TYPE SELECTION’ from the control panel 
(see 2.1.5 and 2.1.4 ‘DIGITECH CS PARAMETERS 
TABLE’ and ‘ACCESSING AND PROGRAMMING 
THE PARAMETERS’);

 › adjust the CO2  combustion value as indicated in 

2.1.3 ‘CO2 VALUE CHECK AND CALIBRATION’.

1

2

2

V

2

G

3

3

D

C

C

MAINTENANCE

fig. 41

fig. 42

fig. 43

Содержание R2K 55

Страница 1: ...er flammable vapors and liquids in the vicinity of this or any other appliance WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch do not use any phone in...

Страница 2: ...14 ANTI FREEZE PROTECTION 20 1 1 15 GAS CONNECTION 21 1 1 16 ELECTRICAL CONNECTION 21 1 1 17 POWER SUPPLY 22 1 1 18 OPTIONAL ELECTRICAL CONNECTIONS 23 1 1 19 VENTING 25 1 1 20 TYPES OF EXHAUST SYSTEMS...

Страница 3: ...2 2 13 ACCESSING THE BOILER 59 2 2 14 ACCESSING THE ELECTRONIC BOARD 60 2 2 15 SYSTEM EMPTYING 61 2 2 16 FAULT SIGNALLING CODES 62 2 2 17 ACTIVE FUNCTIONS SIGNALLING CODES 65 2 2 18 CONVERSION TO A DI...

Страница 4: ...to which the instructions in that section address The titles are differentiated by thickness and size in accordance with their hierarchy The images contain important parts described in the text marked...

Страница 5: ...alidity its duration the obligations and the exemptions please consult the First start up certificate attached to this manual The manufacturer reserves the right to modify the tools and relative techn...

Страница 6: ......

Страница 7: ...be performed only by qualified personnel having the appropriate technical training in the field for the installation and maintenance of components of civil and industrial domestic hot water productio...

Страница 8: ...plant and a water supply network appropriate for its power and performance The location must be properly vented through an air vent The air vent must be placed at floor level to prevent it from being...

Страница 9: ...eat input with a minimum of 100 cm2 15 5 in2 2 Where required by code or when required for additional opening must be provided at the highest practical elevation With a hermetically sealed combustion...

Страница 10: ...ements cardboard box wooden crate nails fasteners plastic bags expanded polystyrene etc are dangerous and must be kept out of the reach of children they should be biscarded properly To unpack the boil...

Страница 11: ...5 4 21 2 76 3 31 6 06 C F 410mm 211mm 70mm 113mm 157mm 70mm 154mm 84mm 279mm 107mm 52mm VS R A A F C C G G NOTE THESE ARE CONNECTION SIZES BEFORE VALVE KIT CONNECTION CONVERSION KIT IS INSTALLED fig 2...

Страница 12: ...installation the boiler is provided with a jig that allows setting in advance the connections to the tubes providing the ablility of connecting the water heaters to completed masonry structure 1 1 8 A...

Страница 13: ...nto the wall must have the right slope Please use the lower wall bracket fig 6 5 Unscrew the lower bracket screws from the bottom of the boiler Slide the lower bracket fig 7 in order to separate the b...

Страница 14: ...SA 1 INSTALLATION INSTALLER 1 1 9 CIRCULATOR PERFORMANCE CURVE UPSO 15 58 AOKR III II I H ft Q US gpm 0 2 4 6 8 10 22 20 18 16 14 12 10 8 6 4 2 0 HEAD LOSS ft W C FLOW RATE US gpm III Circulator prior...

Страница 15: ...ntly installed plants Based on the characteristics of the inlet water you should install suitable water treatment devices for residues presence Please install an inline filter The pressure of the cold...

Страница 16: ...lief valve and the boiler DANGER Improper installation of the pressure relief valve may result in property damage personal injury or death Follow all instructions and guidelines when installing the pr...

Страница 17: ...fill the system as follows 1 Make sure the circulator is not blocked 2 Slightly loosen the cap of the circulator air eliminator 1 fig 11 to release the air from the system 3 Slightly loosen the cap of...

Страница 18: ...Before starting the boiler you have to fill the condensate collection siphon in order to avoid flue back up through the siphon Fill the condensate collection siphon as follows see fig 15 Unscrew the T...

Страница 19: ...nthat could cause hazardous backflow of the condensate into the boiler To connect the condensate drain use only corrosion resistant material for the drain line CONDENSATE NEUTRALIZER KIT The condensat...

Страница 20: ...ng the burner until the water reaches the temperature of 86 F 30 C The system starts even if display appears OFF as long as the boiler is connected to the power 120 V and gas supply For long periods o...

Страница 21: ...ta plate 1 1 16 ELECTRICAL CONNECTION DANGER The equipment is electrically safe only if it is properly connected to an efficient grounding system performed in compliance with the safety standards in f...

Страница 22: ...loosen the two screws and remove the plate A see fig 16 after removing the plate connect the electrical cables to terminal B see fig 16 the yellow green cable to the terminal marked with grounding sy...

Страница 23: ...18 After removing the plate connect the electrical cables to terminal B see fig 18 For the external temperature Probe connect the two non polarized conductors to the Se Se contacts For the environmen...

Страница 24: ...items below to the electronic board see fig 19 After performing these operations remount the crankcase and the front casing TP CT BUS 0 10V GND BUS 11 10 9 8 7 12 13 14 15 16 17 M12 M9 M7 M5 M2 M4 M8...

Страница 25: ...axial terminal in relation to the slopes inside the exhaust pipe and to protect the combustion air pipe from adverse weather conditions Refer to section 1 1 18 sub section III a and figure 20 This app...

Страница 26: ...in 30 cm Non direct vent 4 ft 1 2 m below or to side of opening 1 ft 300 mm above opening Direct vent 12 in 30 cm C Clearance to permanently closed window Zero clearance to permanently closed window...

Страница 27: ...learance to nonmechanical air supply inlet to building or the combustion air inlet to any other appliance 12 in 30 cm Non direct vent 4 ft 1 2 m below or to side of opening 1 ft 300 mm above opening D...

Страница 28: ...re necessary Traps if used should have pipe slopes not less than 1 4 in ft 21 mm m downwards to the trap The use of thermal insulation shall be prohibited on non metallic vent pipe and fittings in con...

Страница 29: ...nted hot boilers can be installed with one single vent pipe for exhaust Please refer to Table 1 Allowable vent lenghts for maximum vent run Single vent installations can be either be installed through...

Страница 30: ...ase refer to figure E for through the wall single vent installations II b THROUGH THE ROOF INSTALLATION Please refer to figure F for through the roof single vent installations 12 minimum above average...

Страница 31: ...CPVC pipe Ensure that the adapters are installed correctly into the correct locations as per the attached figure 21 Installation instructions cod 65 00433 FLUE EXHAUST COMBUSTION AIR INTAKE fig 21 Re...

Страница 32: ...he maximum exhaust length or linear reference length can be calculated by summing the length of the linear tube When terminating horizontally install an elbow at the end of the terminal For area where...

Страница 33: ...20 m Natural or Propane PVC CPVC Polypropylene PVC CPVC Poly propylene ABS Horizontal Vertical Single Vent 4 100 mm 1 6 ft 0 5 m 100 ft 30 m Natural or Propane PVC CPVC Polypropylene PVC CPVC Poly pr...

Страница 34: ...96005 197040 52CVKGVS6502 28 ft 8 5 m 196105 197033 52CVKGVS6502 28 40 ft 12 1 m 196125 52CVKGVS6502 40 3 80 mm 20 ft 6 m 196006 197009 52CVKGVS6503 52CVKGVSF9003 32 ft 9 7 m 196106 197107 52CVKGVS650...

Страница 35: ...6 Single Wall Pipe 72 305mm Z Dens 2ZDP372 Single Wall Pipe Z Dens 2ZDE345 Single Wall 45 Elbow Z Dens 2ZDE387 Single Wall 87 Elbow Z Dens 3PPS CDC Single Wall Condensate Drain Z Dens 3PPS TCDC Single...

Страница 36: ......

Страница 37: ...All operations described below relative to first start up maintenance and replacement and should be performed only by qualified service technician 1 SUPPORT CENTER SECTION 2 SUPPORT CENTER SECTION...

Страница 38: ...lack of gas Make sure that the device supply voltage corresponds with that on the plate 120 V 60 Hz and that the wiring is correct Make sure that the grounding system works properly Make sure that th...

Страница 39: ...s 5 minutes After each water pressure reset the boiler will automatically perform a reduced system relief cycle of 2 minutes Throughout this function the display will show the code F33 The boiler can...

Страница 40: ...25 of the Off Set adjuster To increase the CO2 value turn the screw clockwise and counter clockwise if you want to decrease it Once completed the adjustment tighten the protection screw A fig 25 on th...

Страница 41: ...enu and adjust their values follow the procedure below 1 Press the button to select the OFF mode displayed using the symbol 2 Hold at the same time the keys and until on the display appears the symbol...

Страница 42: ...ic circuit to change the value of the parameter 5 Press the key to confirm the action and wait for the display to stop blinking indicating the adjustment was implemented 6 To exit the parameters menu...

Страница 43: ...N READ THE INSTRUCTION IN 2 2 19 CONVERSION TO A DIFFERENT GAS TYPE BEFOR E CHANGING THIS PARAMETER 0 1 0 NATURAL GAS AND SETS FAN SPEED SETTING AT PARAMETERS P10 P11 P12 P13 1 PROPANE AND SETS FAN SP...

Страница 44: ...FOR A PERIOD OF TIME EQUAL TO THE POST CIRCULATION SEE PARAMETER P09 SO AS TO MAINTAIN THE SECONDARY EXCHANGER HOT 0 1 0 DISABLED SET BY DEFAULT 1 ENABLED P07 HEATING TIMING THROUGH THIS PARAMETER YO...

Страница 45: ...1HZ 30 RPM P12 HEATING FAN MINIMUM SPEED ADJUSTMENT THROUGH THIS PARAMETER YOU CAN SET THE FAN MINIMUM SPEED IN HEATING PHASE THAT CORRESPONDS TO THE MINIMUM BURNER POWER DURING A REQUEST TO OPERATE...

Страница 46: ...OF THE ACCUMULATION BOILER EVERY 7 DAYS THE WATER TEMPERATURE INSIDE THE ACCUMULATION BOILER IS HEATED BEYOND 140 F 60 C THUS GENERATING A BURNING HAZARD KEEP UNDER CONTROL SUCH DOMESTIC HOT WATER TR...

Страница 47: ...PERATURES TM REFER TO STANDARD SYSTEMS 86 167 F 30 75 C OR FLOOR SYSTEMS 77 113 F 25 45 C THE SYSTEM TYPE CAN BE SET FROM PARAMETER P03 0 30 SET BY DEFAULT AT 15 THE NUMBERING OF THE VALUE CORRESPONDS...

Страница 48: ...IN F P23 MODULATING PUMP MINIMUM SPEED ONLY WITH MODULATING PUMP AND RETURN PROBE CONNECTED THROUGH THIS PARAMETER YOU CAN SET THE MINIMUM SPEED VALUE OF THE MODULATING PUMP DURING A REQUEST TO OPERA...

Страница 49: ...ONNECTED TO THE BOILER BOARD AUTOMATICALLY THE VALUE OF THIS PARAMETER BECOMES 1 BUT IF THE SOLAR AUXILIARY BOARD IS SUCCESSIVELY DISCOUNNECTED THE DISPLAY OF THE CONTROL PANEL OF THE BOILER WILL DISP...

Страница 50: ...NT CIRCULATION UPON THE IGNITION THE ACTIVATION OF THIS PARAMETER AGAINST EACH IGNITION OF THE BURNER LEADS TO THE VERIFICATION OF THE CORRECT OPERATION OF THE CIRCULATING PUMP SHOULD THE PUMP NOT RUN...

Страница 51: ...HOT WATER LINE Natural Gas Hz 45 255 45 255 Propane Hz 45 251 45 251 Note The frequency would change based on vent length See section 1 1 21 TABLE 1 ALLOWABLE VENT LENGTHS for change on frequency with...

Страница 52: ...check the operation of the gas burner start up and safety systems If necessary remove and clean the flame detection and start up electrodes from incrustations paying attention to respect the distances...

Страница 53: ...mum heat capacity Gas E propane 10 2 9 8 Heating circuit Adjustable heating temperature F C 86 167 77 113 30 75 25 45 Maximum operating temperature for heating circuit F C 203 95 Maximum operating pre...

Страница 54: ...ns Voltage frequency V Hz 120 60 Maximum absorbed power W 180 Pump electrical power consuption W 62 Gas supply Nominal supply pressure Gas A inWC mbar 7 17 4 Fuel consumption Gas A ft3 h m3 h 183 7 5...

Страница 55: ...TION SIPHON 7 CIRCULATOR 8 GAS VALVE 9 SYSTEM DRAINING TAP 10 AIR ELIMINATOR 11 WATER TEMPERATURE HIGH LIMIT SWITCH 12 CENTRAL HEATING TEMPERATURE PROBE 13 AIR PRESSURE SWITCHES 14 SPARK ELECTRODE 15...

Страница 56: ...N BLOWER 5 AIR ELIMINATOR 6 CIRCULATOR 7 GAS VALVE 8 PRESSURE RELEIF VALVE 30 psi 2 bar 9 SYSTEM DRAINING TAP 10 CENTRAL HEATING TEMPERATURE PROBE 11 WATER TEMPERATURE HIGH LIMIT SWITCH 12 AIR SUCTION...

Страница 57: ...ATION Important The working position of the 3 way valve is indicated by the color Red or Blue visible in the inside of the valve see C fig 36 The RED color with C A indicates the operation in the Dome...

Страница 58: ...SSURE SWITCH G GREEN SF CONDENSATE COLLECTION SIPHON br bl br bl br bl br y w gy EV bk bl bk br MF TS TF SR o o bl br br bl bk bk MP Pacq 11 10 9 8 7 12 13 14 15 16 17 M12 M9 M7 M5 M2 M4 M8 M10 M15 M1...

Страница 59: ...n the front of the boiler proceed as follows remove the fastening screws 1 fig 38 placed on the lower edge of the front panel grab the front panel from the bottom and remove it pulling it towards you...

Страница 60: ...ene on the wirings of the control panel please proceed as follows DANGER Cut off the voltage from the main switch Grab at the same time the support brackets of the control panel fig 39 loosening them...

Страница 61: ...t the other end of the tube to a suitable discharge turn the discharge tap of the system RS fig 40 open the relief valves of the radiators starting from the one at the top and continuing downwards aft...

Страница 62: ...1 FLAME FAILURE NO FLAME LIGHT UP MANUAL RESET PRESS THE RESET KEY NO GAS PRESSURE CHECK THE GAS SUPPLY MASS OR BROKEN START UP ELECTRODE REPLACE IT GAS VALVE NOT OPENING REPLACE IT SLOW LIGHT UP TOO...

Страница 63: ...i 0 3 bar LOAD THE SYSTEM AUTOMATIC WATER PRESSURE SWITCH CABLE DISCONNECTED CHECK THE WIRING WATER PRESSURE SWITCH BROKEN REPLACE IT E05 DOMESTIC INLET TEMPERATURE BROKEN OR INCORRECTLY CALIBRATED PR...

Страница 64: ...NTERNAL BOARD ERROR INCORRECT SIGNAL RECOGNITION BY THE MODULATION BOARD MICRO PROCESSOR IF THE MODULATION BOARD DOES NOT RESET THE ERROR AUTOMATICALLY REPLACE IT AUTOMATIC E22 PARAMETERS PROGRAMMING...

Страница 65: ...FREEZE THE FUNCTION IS AUTOMATICALLY ENABLED WHEN THE D H W SENSOR DETECTS A TEMPERATURE OF 39 2 F 4 C THE BOILER OPERATES AT MINIMUM GAS PRESSURE WITH THE DIVERTER VALVE IN THE SUMMER POSITION THE F...

Страница 66: ...the rear side of venturi C fig 43 replace the body venturi with the one suitable for the type of supply gas cod 30 00230 for NATURAL GAS cod 30 00229 for PROPANE and make sure the tooth D fig 43 is ad...

Страница 67: ...OSITIONS OF THE ELECTRODES If the boiler does not restart check the positions of the electrodes especially the ignition electrode 0 16 3mm 0 31 0 39 8 10mm 0 39 0 47 10 12mm DETECTION ELECTRODE LIGHT...

Страница 68: ...RADIANT BRUCIATORI s p a Via Pantanelli 164 166 61025 Loc Montelabbate PU Tel 39 0721 9079 1 fax 39 0721 9079279 e mail info radiant Internet http www radiant it...

Отзывы: