Bantam Plus Getting Started Guide v6
43
Radian Research, Inc.
Step 5. If necessary liners can be replaced using of RB-SMK Socket Maintenance
Kit available from Radian Research.
Step 6. Before replacing the socket assembly cover ensure that the socket assembly
dividers found on the base of the socket assembly cover sit either side the voltage
conductors. Failure to do so could result in bending the voltage conductors
preventing a meter insertion. Replace the socket assembly cover and retighten the
five Torx screws.
Step 7. Perform a Standards Compare to validate the performance using Standards
Compare information found in section 6.1.
Figure 16
Removable Socket Liners
The RB-2X Bantam Plus Portable Test System
produces high voltages and is serviceable only by
qualified personnel. Attempts to service the
equipment by unqualified personnel can result in
personnel injury.
8.3.2 Warranty Service
Radian Research, Inc. warrants that each product is free from defects in material and
workmanship. Our obligation under this warranty is to repair or replace any
instrument or component therein that, within two years after shipment and with
normal use, proves to be defective upon examination.
W
ARNING
!
Removable socket
liners
Содержание Bantam Plus RB-2 Series
Страница 1: ......