background image

H O M E   S T O R A G E   P R O D U C T S

WWW.RACORSTORAGESOLUTIONS.COM

WARNING

Please read installation instructions carefully prior to installing. Before using the product thoroughly test the fully-weighted 

product (with equipment in place) to ensure the product has been installed properly. Do not allow children to play on 

product. ITW Brands is not responsible for any damage resulting from improper installation, overloading or product failure.

BIKE LIFT | PBH-1R

INSTRUCTIONS

2

1

MARK

MARK

3

KNOT

Measure the distance between the 

handle bars and seat of the bike. 

Mark that distance on ceiling 

joist(s).

Feed rope through square hole on 

the back lift assembly. Tie a double 

knot as shown. The knotted end 

will be between joist/ceiling and 

lift assembly.

Use two wood screws each to 

mount the back pulley and the 

front pulley to the ceiling, ensuring 

the distance between the two 

matches the measurement made in 

step 1. Predrilling 1/8 in. pilot holes 

in the ceiling will make mounting 

the pulleys easier.

Phillips driver

1/8” Drill bit

Drill

TOOLS REQUIRED

x1 

Back lift Assembly

x1 

Front lift Assembly

x2 

Hook Pulleys

x1 

48 foot (14.6m) rope   

x1 

Rope Cleat

x6 

2’’ (5 cm) wood screws

Tape Measure

     

PARTS LIST

Отзывы: