H O M E S T O R A G E P R O D U C T S
WWW.RACORSTORAGESOLUTIONS.COM
WARNING
Please read installation instructions carefully prior to installing. Before using the product thoroughly test the fully-weighted
product (with equipment in place) to ensure the product has been installed properly. Do not allow children to play on
product. ITW Brands is not responsible for any damage resulting from improper installation, overloading or product failure.
BIKE LIFT | PBH-1R
INSTRUCTIONS
2
1
MARK
MARK
3
KNOT
Measure the distance between the
handle bars and seat of the bike.
Mark that distance on ceiling
joist(s).
Feed rope through square hole on
the back lift assembly. Tie a double
knot as shown. The knotted end
will be between joist/ceiling and
lift assembly.
Use two wood screws each to
mount the back pulley and the
front pulley to the ceiling, ensuring
the distance between the two
matches the measurement made in
step 1. Predrilling 1/8 in. pilot holes
in the ceiling will make mounting
the pulleys easier.
Phillips driver
1/8” Drill bit
Drill
TOOLS REQUIRED
x1
Back lift Assembly
x1
Front lift Assembly
x2
Hook Pulleys
x1
48 foot (14.6m) rope
x1
Rope Cleat
x6
2’’ (5 cm) wood screws
Tape Measure
PARTS LIST