and are used extensively by Navy and Defence forces for rapid determination of the sound velocity
without stopping the vessel.
8.6
The sound velocity cast
There are no set rules for when to take a measurement of the water column sound velocity.
Common sense is a good guideline. The conditions, detailed below, have a major influence as to
when to take a sound velocity cast.
8.6.1
Time of Day
Throughout the day the upper-level sound velocity characteristic will change mainly due to solar
heating or cooling due to cloud cover or precipitation. Another main element of the time of day
changes is tides.
When working in tidally influenced areas, the sound velocity can change drastically due to a salt
wedge that moves in and out with the tide. The surveyor must be aware of the relationship of the
time of the tide to the salt wedge.
8.6.2
Freshwater influx
Any river, stream or runoff will drastically change the sound velocity through the introduction of
freshwater and also through a temperature difference.
8.6.3
Water Depth
The sound velocity cast should always be made in the deepest part of the survey area. The sound
velocity profile cannot be extrapolated to deeper depths as there are too many possible variables.
8.6.4
Distance
If the survey area is large, then it is quite possible that there will be differences across the range of
the survey area even in open water.
8.6.5
Deploying and recovering the Sound Velocity Probe
The guidelines for deploying and recovering the sound velocity probe are based on common sense
but are sometimes ignored during the actual operation. The guidelines, below, are for a hand cast in
shallow water. The softline, used for the cast, should be marked to provide an indication of the
amount of line out.
8.6.5.1
Shallow water sound velocity cast/deployment by hand
1.
Plan where the cast is to be made.
a.
In a small area, deploy in the deepest part of the survey area.
b.
Always do a cast prior to starting the survey.
2.
Liaise with the captain or officer of the watch with the plan position and time of deployment
and time required for the cast.
3.
Prepare the probe for casting (some probes may need to be programmed prior to each
launch).
4.
Secure the probe to the downline with a bowline knot or shackle.
Содержание 2026
Страница 2: ...Page 2 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 14: ...Page 14 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 22: ...Page 22 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 28: ...Page 28 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 32: ...Page 32 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 39: ...Page 39 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 24 Projector cable clamp bolt mounting arrangement...
Страница 48: ...Page 48 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 55: ...Page 55 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 42 Projector cable as of 17 March 2022...
Страница 56: ...Page 56 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 116: ...Page 116 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 120: ...Page 120 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 122: ...Page 122 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 131: ...Page 131 of 254 Version 6 3 Rev r012 Date 05 11 2022...
Страница 138: ...Page 138 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 158: ...Figure 174 Smooth log information copied from a real time survey log...
Страница 182: ...Page 182 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 198: ...Page 198 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 210: ...Page 210 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 234: ...Page 234 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 237: ...Page 237 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 215 Sonic 2026 Projector...
Страница 241: ...Page 241 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 219 Sonic 2022 Receiver Projector horizontal offset...
Страница 242: ...Page 242 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001 Figure 220 Sonic 2024 Mounting Bracket Drawing...
Страница 243: ...Page 243 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 221 Sonic 2022 Mounting Bracket Drawing...
Страница 244: ...Page 244 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001 Figure 222 Sonic 2026 Mounting Bracket Drawing...
Страница 245: ...Page 245 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 223 Sonic 2024 2022 Mounting Bracket Flange...
Страница 246: ...Page 246 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001 Figure 224 SIM Box Drawing...
Страница 247: ...Page 247 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 225 SIM Stack Outline...
Страница 249: ...Page 249 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 227 Locking Ring type Deck Lead...
Страница 250: ...Page 250 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001 Figure 228 I2NS Type 42 IMU Dimensions...
Страница 251: ...Page 251 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 229 I2NS Type 82 IMU offsets...
Страница 252: ...Page 252 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001 Figure 230 I2NS IMU Cable...
Страница 253: ...Page 253 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 231 I2NS SIM Dimensions...
Страница 254: ...Page 254 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001 Figure 232 Dual Head Mount Offsets...