Page
140
of
254
Version
6.3
Rev
r012
Date
05-11-2022
Part No. 96000001
during survey operations. If mounting the antenna on a vessel that has helicopter landing facilities,
coordinate the placement of the antenna with the personnel in charge of helicopter operations.
When the location for the antennae has been determined, the next step is determining how the
coaxial cable, connecting the antenna and the receiver, is to be run. The cables should be run in
such a manner to be protected from possible damage. Cables should not be run through hatches or
windows if it can be avoided; if such runs are necessary, then a block or other such obstruction
should be placed so that the hatch or window will not close on the cable. If the cables are to be
suspended between two points, a rope or other line should be strung to carry the weight of the
cables. Cables should never be kinked; all cables have a minimum bending radius, and if it is known,
adhere to it, if it is not known, use common sense. Do not run cables in a manner that they will
become safety hazards on the vessel, causing personnel to trip or be caught on them. Avoid running
cables along voltage carrying lines.
It is important to mark the cables at both ends to denote what they are and to where they go.
The connection to the antenna may be required to be completely waterproofed (depending on the
manufacturer’s recommendations) using electrical tape, with a secondary covering of self-
amalgamated tape. Ensure that there are no air gaps in the tape; they will become a channel for
water. If a cable is to be run upwards from the antenna, form a drip loop by leaving slack in the
cable that will hang below the antenna connector. This will allow any water that flows down the
cable to collect and drip from the slack loop instead of running into the connector.
The cables, connectors and antennae should be inspected regularly for signs of damage, corrosion
or abuse. Any abrasions on the cable should be securely taped; if possible, a waterproof coating
should also be applied.
8.2.2
GPS Calibration
Prior to commencing survey operations, the accuracy of the Differential GPS position and
transformation to local datum should be determined. There are two main methods to determine
the accuracy of the DGPS position and data transformation. For both methods, a local land survey
benchmark is required.
8.2.2.1
Position Accuracy Determination Method 1
The GPS antenna is physically placed over the survey benchmark. The surveyor will ensure that the
antenna has a clear view. This is particularly important if the benchmark being used is in a dock area.
The surveyor will also ensure that if a separate antenna is used to receive differential corrections,
that it is not blocked.
The GPS position data should be logged, in the data collection software, for not less than 15
minutes. The collected data can then be averaged, standard deviations determined and compared
to the published position of the survey benchmark.
The two main causes of error, in this area, are:
Содержание 2026
Страница 2: ...Page 2 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 14: ...Page 14 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 22: ...Page 22 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 28: ...Page 28 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 32: ...Page 32 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 39: ...Page 39 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 24 Projector cable clamp bolt mounting arrangement...
Страница 48: ...Page 48 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 55: ...Page 55 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 42 Projector cable as of 17 March 2022...
Страница 56: ...Page 56 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 116: ...Page 116 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 120: ...Page 120 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 122: ...Page 122 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 131: ...Page 131 of 254 Version 6 3 Rev r012 Date 05 11 2022...
Страница 138: ...Page 138 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 158: ...Figure 174 Smooth log information copied from a real time survey log...
Страница 182: ...Page 182 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 198: ...Page 198 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 210: ...Page 210 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 234: ...Page 234 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 237: ...Page 237 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 215 Sonic 2026 Projector...
Страница 241: ...Page 241 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 219 Sonic 2022 Receiver Projector horizontal offset...
Страница 242: ...Page 242 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001 Figure 220 Sonic 2024 Mounting Bracket Drawing...
Страница 243: ...Page 243 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 221 Sonic 2022 Mounting Bracket Drawing...
Страница 244: ...Page 244 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001 Figure 222 Sonic 2026 Mounting Bracket Drawing...
Страница 245: ...Page 245 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 223 Sonic 2024 2022 Mounting Bracket Flange...
Страница 246: ...Page 246 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001 Figure 224 SIM Box Drawing...
Страница 247: ...Page 247 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 225 SIM Stack Outline...
Страница 249: ...Page 249 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 227 Locking Ring type Deck Lead...
Страница 250: ...Page 250 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001 Figure 228 I2NS Type 42 IMU Dimensions...
Страница 251: ...Page 251 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 229 I2NS Type 82 IMU offsets...
Страница 252: ...Page 252 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001 Figure 230 I2NS IMU Cable...
Страница 253: ...Page 253 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 231 I2NS SIM Dimensions...
Страница 254: ...Page 254 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001 Figure 232 Dual Head Mount Offsets...