R.M. Young 05305V Скачать руководство пользователя страница 4

Page 3

05305V-90(I)

FLANGE    BEARING    REPLACEMENT
If anemometer bearings become noisy or wind speed threshold 

increases  above  an  acceptable  level,  bearings  may  need 

replacement. Check anemometer bearing condition using a Model 

18310 Propeller Torque Disc. If needed, bearings are replaced 

as follows.
1. REMOVE OLD BEARINGS

  a) Unscrew nose cone. Set o-ring aside for later use.

  b) Loosen set screw on magnet shaft collar and remove magnet.

  c)  Slide propeller shaft out of nose cone assembly.

  d) Remove front bearing cap which covers front bearing.

  e) Remove  both  front  and  rear  bearings  from  nose  cone 

assembly. Insert edge of a pocket knife under bearing flange 

and lift it out.

2. INSTALL NEW BEARINGS

  a) Insert new front and rear bearings into nose cone.

  b) Replace front bearing cap.

  c)  Carefully slide propeller shaft thru bearings.

  d) Place  magnet  on  propeller  shaft  allowing  0.5  mm  

(0.020") clearance from rear bearing.

  e) Tighten set screw* on magnet shaft collar.

  f)  Screw  nose  cone  into  main  housing  until  o-ring  seal  is  

seated. Be certain threads are properly engaged to avoid 

cross-threading.

VERTICAL SHAFT BEARING REPLACEMENT

Vertical  shaft  bearings  are  much  larger  than  the  anemometer 

bearings.  Ordinarily,  these  bearings  will  require  replacement  less 

frequently than anemometer bearings. Check bearing condition using 

a Model 18331 Vane Torque Gauge.   
Since this procedure is similar to POTENTIOMETER 

REPLACEMENT, only the major steps are listed here.
1.  REMOVE  MAIN  HOUSING
2.  UNSOLDER  TRANSDUCER  WIRES  AND  REMOVE 

TRANSDUCER  ASSEMBLY  Loosen  set  screws  at  base  of 

transducer assembly and remove entire assembly from vertical 

shaft. 

3.  REMOVE  VERTICAL  SHAFT  BEARING  ROTOR  by  sliding  it 

upward  off  vertical  shaft.

4.  REMOVE  OLD  VERTICAL  BEARINGS  AND  INSTALL  NEW 

BEARINGS.  When  inserting  new  bearings,  be  careful  not  to 

apply  pressure  to  bearing  shields.

5.  REPLACE  VERTICAL  SHAFT  BEARING  ROTOR. 
6.  REPLACE TRANSDUCER  &  RECONNECT  WIRES
7.  REPLACE  MAIN  HOUSING
8.  ALIGN  VANE
9.  REPLACE  NOSE  CONE

*Max set screw torque 80 oz-in

4. INSTALL NEW  POTENTIOMETER

  a) Push new potentiometer into potentiometer mounting & coil 

assembly making sure o-ring is on shaft.

  b) Feed potentiometer and coil wires through hole in bottom 

of potentiometer housing.

  c)  Screw potentiometer housing onto potentiometer mounting 

& coil assembly.

  d) Gently pull transducer wires through bottom of potentiometer 

housing  to  take  up  any  slack.  Apply  a  small  amount  of 

silicone sealant around hole.

  e) Install  transducer  assembly  on  vertical  shaft  allowing  

0.5  mm  (0.020")  clearance  from  vertical  bearing. 

Tighten set screws* at bottom of transducer assembly.

  f)  Place potentiometer adjust thumbwheel on potentiometer 

shaft and tighten set screw*.

  g) Place  potentiometer  coupling  on  potentiometer  adjust 

thumbwheel. Do Not tighten set screw yet.

5. RECONNECT TRANSDUCER WIRES

  a) Using needle-nose pliers or a paper clip bent to form a small 

hook, gently pull transducer wires through hole in junction 

box.

  b) Solder wires to circuit board according to wiring diagram.   

Observe color code.

  c)  Secure  circuit  board  in  junction  box  using  two  screws 

removed in step 2b. Do not overtighten.

6. REPLACE MAIN HOUSING

  a) Place  main  housing  over  vertical  shaft  bearing  rotor.  Be 

careful  to  align  indexing  key  and  channel  in  these  two 

assemblies.

  b) Place main housing over vertical shaft bearing rotor until  

potentiometer coupling is near top of main housing.

  c)  Turn potentiometer adjust thumbwheel until potentiometer 

coupling is oriented to engage ridge in top of  main housing. 

Set screw on potentiometer coupling should be facing the 

front opening.

  d) With  potentiometer  coupling  properly  oriented,  continue 

pushing main housing onto vertical shaft bearing  rotor until 

main housing latch locks into position with a “click”.

7. ALIGN VANE

  a) Connect  excitation  voltage  and  signal  conditioning 

electronics to terminal strip according to wiring diagram.

  b) With mounting post held in position so junction box is facing 

due south, orient vane to a known angular reference. Details 

appear in CALIBRATION section.

  c)  Reach in through front of main housing and turn potentiometer 

adjust thumbwheel until signal conditioning system indicates 

proper value.

  d) Tighten set screw* on potentiometer coupling.
8. REPLACE NOSE CONE

  a)  Screw  nose  cone  into  main  housing  until  o-ring  seal  is 

seated. Be certain threads are properly engaged to avoid 

cross-threading.

Содержание 05305V

Страница 1: ...MENTS INSTRUCTIONS R M YOUNG COMPANY 2801 AERO PARK DRIVE TRAVERSE CITY MICHIGAN 49686 USA TEL 231 946 3980 FAX 231 946 4772 WEB www youngusa com WIND MONITOR AQ MODEL 05305V WITH VOLTAGE OUTPUTS P N...

Страница 2: ...ove ground For some applications it may not be practical or necessary to meet these requirements FAILURE TO PROPERLY GROUND THE WIND MONITOR MAY RESULT IN ERRONEOUS SIGNALS OR TRANSDUCER DAMAGE Ground...

Страница 3: ...tion box Secure cable by tightening packing nut c Connect sensor cable to terminals See wiring diagram d Slide junction box cover down 3 ALIGN VANE a Connect instrument to an indicator b Choose a know...

Страница 4: ...mounting coil assembly making sure o ring is on shaft b Feed potentiometer and coil wires through hole in bottom of potentiometer housing c Screw potentiometer housing onto potentiometer mounting coi...

Страница 5: ...ISM device complies with Canadian ICES 001 Cet appareil ISM est conforme Ia norme NMB 001 du Canada EN55011 CISPR 11 Group 1 Class B device Class B equipment is suitable for use in domestic establish...

Страница 6: ...Page 5 05305V 90 I CABLE WIRING DIAGRAM MODEL 05305V WIND MONITOR AQ...

Страница 7: ...Page 6 05305V 90 I CIRCUIT DIAGRAM MODEL 05305V WIND MONITOR AQ...

Страница 8: ...Page 7 05305V 90 I BEARING REPLACEMENT POTENTIOMETER ADJUSTMENT...

Страница 9: ...30D TRANSDUCER ASSEMBLY 05324 2 VERTICAL SHAFT BEARING 05187 PROPELLER NUT 1 4 20 05164C PROPELLER SHAFT W HUB 6 32 x 1 8 SET SCREW 5 05127 MAIN HOUSING LATCH 6 32 x 3 8 FLAT HD SCREW 05126C VERTICAL...

Страница 10: ...ration Accessories Model18802 AnemometerDrive Model18112 VaneAngleBenchStand Model 18310 Propeller Torque Disc Model 18331 VaneTorqueGauge Model18301 VaneAlignmentRod Model18212 VaneAngleFixture Tower...

Страница 11: ...e Torque Gauge checks vane bearing torque of the Wind Monitor family sensors Slip the fixture over the main housing and make simple yet accurate vane torque measurements Charts relating vane torquetov...

Отзывы: