10
R/Evolution 2530 Getting Started Guide • March 2009
Opening the Enclosure Package
Caution –
Two people are needed to lift and move the enclosure. An enclosure with
all drives installed can weigh approximately pounds (kilograms). Use care to avoid
injury.
1. Select a suitable area for unpacking.
2. Open and carefully unpack the enclosure package.
3. Store all packing material and boxes for possible equipment returns.
4. Carefully remove packaged items from the box.
Caution –
Because the ear caps are not installed on the ear boards upon shipment,
be careful when removing the enclosure from the package so as not to damage the
ear boards.
Checking the Package Contents
Inspect the enclosure package for standard items as well as purchased items.
Depending on the enclosure package, verify the contents of the box against the
items listed in the following tables.
Table 1-1
Contents of a Controller Enclosure Package
Item
Quantity
Controller enclosure
1 or 2 as ordered
6-foot (1.83 m) power cord
2 per enclosure
6-foot (1.83 m) serial cable, RS-232 micro-DB9
1 per controller module
Ear caps
1 right
1 left
Documentation:
• Setup poster
• R/Evolution 2530 Getting Started Guide
• EIP Environmental Information
1 of each