Quoizel PO9140K Скачать руководство пользователя страница 1

1of3

Assembly Instruction Sheet #IS-PO9140

_R1

For Style PO9140XX

6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com

,

.

.

.

Please go to

for product cleaning tips. Go to the

selection.

30-45 minutes

Identify and inspect all parts before beginning installation. Check package content list and diagrams below to be sure all parts are

present. If any parts are missing or damaged, do not attempt to assemble, install, or operate the fixture. Contact customer service for replacement
parts.

www.quoizel.com

Care + Maintenance

Estimated Assembly Time:
Preparation:

Tools Required:

Flathead screwdriver, Phillips screwdriver, Shovel, Electrical tape, Wire cutter, Safety glasses, Wire strippers and proper length

wires (not supplied).

Warnings and Cautions

Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.

These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.

2016 QuoizelInc.

RevisedDate:2016-10-24

Thank you for purchasing a Quoizel product.

Need assistance with parts or assembly? Call Quoizel customer service at 1-800-645-3184

or visit us on-line at www.quoizel.com

Package Contents

B

Small Allen Wrench
x 1

A

Big Allen Wrench
x 1

C

Anchor Bracket
x 1

D

Allen Bolt
x 3

E

Lock Ball
x 3

F

Washer
x 3

Lock Washer
x 3

G

Hex Nut
x 3

H

Anchor Bolt
x 3

I

J

Allen Set Screw
x 4

K

Post Fitter
x 1

L

Upper Post
x 1

M

Middle Post
x 1

N

Bottom Post
x 1

STEP 1

Assemble Anchor Bolts to the Anchor Bracket

-

A. Remove all Lock Washers (G), Hex Nuts (H) and Lock Balls (E) from

the Anchor Bolts (I).

B. Screw the threaded end of each Anchor Bolt (I) in the Mounting

Bracket (C) making sure to that the Anchor Bolt (I) is 1.75” to 2”
extended from the bottom of the Bracket (C).

C. Place a Lock Washer (G) over the Anchor Bolt (I) and then thread the

Hex Nut (H) onto each Anchor bolt (I). Securing the Bracket (C) in
place maintaining the 1.75”-2” length of the Anchor Bolt (I).

1.75” - 2”

H

G

C

I

C

G

H

I

Figure 1

STEP 2

Install Anchor

Bolts in the ground

-

A. Dig a hole in the ground at

the desired location for the
Post Mount.

B. Use cement to secure the

Anchor Bolts (I) into the
ground making sure that
the Bracket (C) is flush on
top of the cement and level
Anchor at the desired
grade with the ground. This
is the base for the Post
Mount.

Tube

Cement

Earth

Earth

Wires

1.75” - 2”

Dia. 9-11/16”

Bolt

Bolt Circle

C

I

Figure 2

Отзывы: