background image

If you have any 

questions about 

the installation, call 

Customer Care at 

888-554-2782

BEVI from Quench

 Pre-Installation Checklist

Thank you for being a Quench customer! We are excited for your workplace to 

experience the great-tasting sparkling water from your new 

BEVI from Quench

Before our certified technician can install your machine, the following pre-installation 

requirements must be completed.

Water Supply 

Electrical

Dedicated 120 VAC/60Hz/15 amp (standard 3-prong)

 GFCI-protected

 circuit

Electrical connections within 5' of machine location; 

NO EXTENSION CORDS

o

Quench recommends installing an electrical outlet inside the cabinet

that will house the chiller/carbonator, specifically for countertop

installations.

Placement

Ventilation

3/8" potable water supply line terminating in 3/8" ball valve with 3/8" female pipe

thread to connect to (ball valve must be accessible for service and installation)

Minimum water supply pressure 50 PSI, 

1.3 

gallon per minute minimum flowrate

Must be a dedicated 3/8" water supply line with no other connections

Any water line or valve less than 3/8" is not acceptable

Countertop machines:

o

1 cabinet layout requires 25 in

minimum ventilation space; 2 cabinet layout

 

requires 15 in

2

 minimum for cabinet containing carbonator

o

Cabinet with carbonator must have at least four 2" cutouts in the toe board

 

or vents/louvres installed on the cabinet doors.

o

If using a 2 cabinet layout, an additional 4" diameter connecting hole may

 

be 

required. Please see reverse side for conceptual drawing.

o

Quench technicians are permitted to drill ventilation cutouts in the toe board

 

and any necessary connecting holes. Quench technicians 

are not

 permitted

 

to install vents or louvres on cabinet doors.

Freestanding machines

 require 

4

" clearance 

behind and above the machine along

 

with 2.5" on each side 

of the machine for ventilation

.

Countertop machines:

 4" diameter hole on the top of the counter to allow routing

of

 

beverage tubing lines; 

please see attached template for hole placement

Minimum cabinet dimensions:

o

1 cabinet layout: 34" w x 24" d x 28" h

o

2 cabinet layout: 24" w x 24" d x 28" h and 12" w x 24" d x 28" h

            18" w x 24" d x 28" h and  18" w x 24" d x 28" h

Recommend using 2 cabinets to separate c

arbonator

 unit (which gives off heat)

from

 

flavor syrups; 

please see reverse side for conceptual drawing

Quench technicians are only permitted to drill up to 1

-1/2

" diameter holes

through laminate or Corian counters. Any other surface or hole size must be

pre-drilled prior to install.

Freestanding machines:

 require 2' x 2' floor space for installation

Отзывы: