EN
.
22
7.1. Installing the device behind a light switch
The installation process, tested and approved by professional electricians, consists of the
following simple steps:
Step 1
–
Turn OFF the fuse:
•
To prevent electrical shock and/or equipment damage, disconnect electrical power at
the main fuse or circuit breaker before installation and maintenance.
•
Be aware that even if the circuit breaker is off, some voltage may remain in the wires
—
before proceeding with the installation, be sure no voltage is present in the wiring.
•
Take extra precautions to avoid accidentally turning the device on during installation.
Содержание Flush 2 relay
Страница 17: ...EN 17 4 Package Contents Flush 2 Relay Device Installation Manual...
Страница 24: ...EN 24 After Qubino installation...
Страница 25: ...EN 25 3 WAY INSTALLATION WITH 2 SWITCHES CONTROLLING THE SAME LIGHT Before Qubino installation...
Страница 26: ...EN 26 After Qubino installation when power line and load line are in the same switch box...
Страница 27: ...EN 27 After Qubino installation when power line and load line are in different switch boxes...
Страница 28: ...EN 28 Before Qubino installation Where there is no neutral line N in switch box...
Страница 29: ...EN 29 After Qubino installation Where there is no neutral line N in switch box...
Страница 36: ...EN 36 Step 5 Turn the fuse on Step 6 Re include the device to your network...
Страница 37: ...EN 37 Step 7 Start using the temperature sensor in connection with your device...