EN
.
21
7. Installation
Before installing the device, please read the following carefully and follow the instructions
exactly:
ⓘ
Danger of electrocution!
Installation of this device requires a great degree of skill and may be performed only by a
licensed and qualified electrician. Please keep in mind that even when the device is turned off,
voltage may still be present in the device
’s terminals.
ⓘ
Note!
Do not connect the device to loads exceeding the recommended values. Connect the device
exactly as shown in the provided diagrams. Improper wiring may be dangerous and result in
equipment damage.
Electrical installation must be protected by directly associated overcurrent protection fuse
4A, gG or Time lag T, rated breaking capacity 1500A (ESKA 522.723) must be used according to
wiring diagram to achieve appropriate overload protection of the device
.
The fuse must be
installed in fuse holder type: Adele contact 503Si/1 DS according to the standard IEC60669-2-
1. This standard is used in Europe only.
Содержание Flush 2 relay
Страница 17: ...EN 17 4 Package Contents Flush 2 Relay Device Installation Manual...
Страница 24: ...EN 24 After Qubino installation...
Страница 25: ...EN 25 3 WAY INSTALLATION WITH 2 SWITCHES CONTROLLING THE SAME LIGHT Before Qubino installation...
Страница 26: ...EN 26 After Qubino installation when power line and load line are in the same switch box...
Страница 27: ...EN 27 After Qubino installation when power line and load line are in different switch boxes...
Страница 28: ...EN 28 Before Qubino installation Where there is no neutral line N in switch box...
Страница 29: ...EN 29 After Qubino installation Where there is no neutral line N in switch box...
Страница 36: ...EN 36 Step 5 Turn the fuse on Step 6 Re include the device to your network...
Страница 37: ...EN 37 Step 7 Start using the temperature sensor in connection with your device...