Verification Tests
A collection of verification tests are available to assist you or a customer
service engineer (CSE) in determining whether the library is properly
installed, configured, and operational. Running the tests is an important
part of ensuring that the system is working correctly.
Note:
Because resolving an issue often involves complex technical
procedures, such as removing and replacing FRUs, and because
verification tests often require preparation and trained
interpretation of results, it is recommended that a CSE perform
the tests.
There are four types of verification test that help diagnose problems
with the library:
•
•
Smaller library configuration requires about 1 hour and the larger
configurations require as long as 6 hours to run the Install Test.
•
•
These verification tests provide the following:
• Fully automated tests
• Tests to determine problems with installation
• Detailed problem analysis
• Full system tests or individual field replaceable unit (FRU) tests
• Logs of installation and configuration tests
• Graphical reports showing passed and failed results
• No affect to integrity of data
To perform these tests, the accessor assembly must be ready and
functional, and the library must be powered on. In addition, the library
must be in an offline state, and at least one scratch tape must be
inserted in the I/E station.
Содержание Scalar i6000
Страница 1: ...User s Guide Scalar i6000 6 66879 15 Rev B...
Страница 140: ...Chapter 2 Troubleshooting Your Library Accessing Online Help 122 Quantum Scalar i6000 User s Guide...
Страница 276: ...Chapter 3 Configuring Your Library Working with Towers 258 Quantum Scalar i6000 User s Guide...
Страница 290: ...Chapter 5 Advanced Reporting Viewing Cross Partition Media Moves 272 Quantum Scalar i6000 User s Guide...
Страница 344: ...Chapter 8 Encryption Key Management Using SKM 326 Quantum Scalar i6000 User s Guide...
Страница 444: ...Chapter 11 Configuring Access to StorNext 426 Quantum Scalar i6000 User s Guide...
Страница 450: ...Chapter 12 Partition Utilization Reporting 432 Quantum Scalar i6000 User s Guide...
Страница 532: ...Chapter 14 Using the Command Line Interface Command Line Interface CLI Commands 514 Quantum Scalar i6000 User s Guide...
Страница 574: ...Chapter 15 Maintaining Your Library Maintenance Actions 556 Quantum Scalar i6000 User s Guide...
Страница 706: ...Chapter 15 Maintaining Your Library Robot Tower and Power Rail Health Checks 688 Quantum Scalar i6000 User s Guide...
Страница 726: ...Chapter 16 Working With Cartridges and Barcodes Managing and Moving Media 708 Quantum Scalar i6000 User s Guide...
Страница 730: ...Appendix A Frequently Asked Questions 684 Quantum Scalar i6000 User s Guide...