Chapter 3: Configuring Your Library
Managing Connectivity
Quantum Scalar i6000 User’s Guide
179
On the
Configuration
tab, settings are unavailable if the current
state of the tab is set to
Disabled
.
Be aware that there might be incompatibilities with channel zoning
configuration on the I/O blade if you enable host port failover.
7
Accept the recovery setting default values unless an authorized
representative advises you otherwise.
8
Before you set recovery settings, understand the following elements
in the
Recovery Setting
area:
•
Error count recovery mode
sets the recovery scenario for all
ports when port failure is caused by excessive errors on the port.
The only setting option is
Require Intervention
.
•
Link down error recovery mode
sets the recovery scenario for
all ports when port failure is caused by the port going offline for
more time than the threshold specified in the
Link down delay
time
text box. The only setting option is
Require Intervention
.
•
Link down delay time
sets the timeout threshold before link
down status applies. The default value is zero (0) seconds. There
is no maximum value.
Require Intervention
means that a user
must manually use the
Physical Ports
tab to bring a failed port
that has recovered back online.
9
Configure the
Primary Port
. Only ports that are in target mode and
point-to-point connection can participate in host port failover. The
primary port becomes active by default and the alternate port will
go on passive standby until a failover occurs. Use the
Select
Primary
drop-down list to select from the target ports that are
online and available. You must select a primary port.
Current Active
indicates the currently active port.
10
Click
Set
. If your configuration has errors, a warning message
appears.
Enabling a Target Port
Use the
Physical Ports
tab to manually enable an online target port that
was disabled because of a previous connection error. If the
Intervention
column displays “true,” you must manually bring the recovered port
back online using
Enable
. If the port state is “disabled,” the port's
connection is repaired and it is ready to be re-enabled. If the
Configuration
tab itself is disabled, the table on the
Physical Ports
tab
will be empty.
Содержание Scalar i6000
Страница 1: ...User s Guide Scalar i6000 6 66879 15 Rev B...
Страница 140: ...Chapter 2 Troubleshooting Your Library Accessing Online Help 122 Quantum Scalar i6000 User s Guide...
Страница 276: ...Chapter 3 Configuring Your Library Working with Towers 258 Quantum Scalar i6000 User s Guide...
Страница 290: ...Chapter 5 Advanced Reporting Viewing Cross Partition Media Moves 272 Quantum Scalar i6000 User s Guide...
Страница 344: ...Chapter 8 Encryption Key Management Using SKM 326 Quantum Scalar i6000 User s Guide...
Страница 444: ...Chapter 11 Configuring Access to StorNext 426 Quantum Scalar i6000 User s Guide...
Страница 450: ...Chapter 12 Partition Utilization Reporting 432 Quantum Scalar i6000 User s Guide...
Страница 532: ...Chapter 14 Using the Command Line Interface Command Line Interface CLI Commands 514 Quantum Scalar i6000 User s Guide...
Страница 574: ...Chapter 15 Maintaining Your Library Maintenance Actions 556 Quantum Scalar i6000 User s Guide...
Страница 706: ...Chapter 15 Maintaining Your Library Robot Tower and Power Rail Health Checks 688 Quantum Scalar i6000 User s Guide...
Страница 726: ...Chapter 16 Working With Cartridges and Barcodes Managing and Moving Media 708 Quantum Scalar i6000 User s Guide...
Страница 730: ...Appendix A Frequently Asked Questions 684 Quantum Scalar i6000 User s Guide...