Scalar i2000 Installation Guide
253
18
Evenly apply pressure to both ends of the control management blade (CMB) and slide it into bay 2 of
the I/O management unit. As you insert the CMB, the latchhooks will begin to move towards the middle
of the blade. Push the latchhooks towards the middle of the blades and into the lock position. You will
feel the blade pins connect with the I/O management unit’s backplane as the blade locks into place.
Figure 24
I/O Management Unit Bay Layout
CAUTION
Forcing the blade into the bay can cause the pins to bend.
ba
y
1 (
n
ot
us
ed
)
ba
y 3
(f
ir
st FC
I/
O bla
de
)
ba
y
5 (thir
d
FC
I/O bla
de)
ba
y 4 (secon
d FC
I/O bla
de)
ba
y 6
(
no
t
us
ed
)
ba
y 8 (secon
d Eth
e
rnet
cooling assembly
bay 7
(first Ethernet
ba
y 2 (CMB)
ex
pa
ns
io
n blad
e)
ex
pa
ns
io
n bla
de)
Содержание Scalar i6000
Страница 1: ...6 66881 01 A Scalar i6000 Installation Guide Installation Guide Installation Guide Installation Guide...
Страница 20: ...8 About This Guide and Your Product...
Страница 38: ...26 Installing a Stand Alone Control Module...
Страница 104: ...92 Installing a Multi Module Library...
Страница 156: ...144 Installing Cartridges...
Страница 164: ...152 Setting up Your Library for Access...
Страница 242: ...230 Configuring the Library...
Страница 304: ...292 Adding Optional Hardware eight 2 5 mm screws...
Страница 318: ...306 Adding Optional Hardware...
Страница 336: ...324 Installation Testing and Verification Figure 35 Example Test Log Output...
Страница 356: ...344 Testing and Calibrating the Digital Level...
Страница 362: ...350 LBX Board and Terminator...
Страница 380: ...368 Glossary...
Страница 384: ...372 Index...