Appendix B Installing the Slide Assembly in the Rack
Adjusting the Slide Assembly
ATL P1000 Series User’s Guide
107
Now that the slide assembly is properly installed and adjusted, you
are ready to remove the P1000 from the shipping pallet and mount it in
the rack (see “Removing a Rack-mount Library from the Pallet” on
page 23).
Содержание P1000 Series
Страница 1: ...ATL P1000 Series Tape Library User s Guide 6221101 03 Ver 3 Rel 0...
Страница 8: ...Contents viii ATL P1000 Series User s Guide...
Страница 12: ...Tables xii ATL P1000 Series User s Guide...
Страница 16: ...Preface xvi ATL P1000 Series User s Guide...
Страница 72: ...Chapter 3 Basic Operations Performing Manual Operations 56 ATL P1000 Series User s Guide...
Страница 88: ...Chapter 4 Operator Commands Unloading the Load Port 72 ATL P1000 Series User s Guide...
Страница 112: ...Appendix A Specifications 96 ATL P1000 Series User s Guide...
Страница 124: ...Appendix B Installing the Slide Assembly in the Rack Adjusting the Slide Assembly 108 ATL P1000 Series User s Guide...
Страница 128: ...Glossary 112 ATL P1000 Series User s Guide...