Quality Water For Less Fleck 2510 Скачать руководство пользователя страница 13

PAGE 13

Help: 888-426-5001

QualityWaterForLess.com

f I G u r e   13 - a

f I G u r e   13 - e

f I G u r e   13 - f

f I G u r e   13 - d

f I G u r e   13 - b

f I G u r e   13 - c

6   › d r a I n   c o n n ec t I o n

1)  Locate the barbed fitting and use Teflon tape to 

wrap the threading as shown in Figure 13-A. 

Be 

careful to wrap the tape clockwise with the 

threading towards you.

 Attach the barbed fit-

ting to the DLFC fitting and 

i

 Please use cau-

tion not to over tighten the barbed fitting

2)  Move to the rear of the Fleck 2510 SXT control 

valve, find the drain fitting pin and remove it to 
allow you to insert the DLFC/barbed drain fitting 
as seen in Figure 13-B

3)  Insert the DLFC/Barbed fitting as seen in Figure 

13-C. 

Be sure that the fitting is fully inserted 

into the drain port by clicking it into place

4)  Reinsert the drain fitting pin to lock the DLFC/

barbed drain fitting into the Fleck 2510 SXT con-
trol valve as seen in Figure 13-D

5)  Next, assemble your ½” I.D. drain line to the drain 

barb as shown in Figure 13-E. 

Be sure to use rigid 

wall ½” I.d. tubing that will not flatten.

 

Wrap 

electrical tape over the drain tubing to prevent a tube 
split and clamp the tubing securely into place with the 
included blue clamp as shown in Figure 13-F

6)  Connect the other end of this drain line tubing se-

curely to a standpipe or drain in accordance with all 
local plumbing codes. 

Be sure that the drain line 

is securely in place before putting your softener 

in service. during regeneration, there will be 

increased flow via this tubing which may cause 

the tubing to become loose

Содержание Fleck 2510

Страница 1: ...v1 0 Fleck 2510 Metered Water Softener Install ation Guide...

Страница 2: ...s com We have put together these instructions as reference and to be used as general installation guidelines It is always recommended that a licensed plumber perform all instal lation work according t...

Страница 3: ...on and Filling the Tank Page 9 Installing the Fleck 2510 SXT Valve onto the Tank Page 10 Plumbing the Fleck 2510 SXT Valve into your Home Page 11 Making the Brine Tank Connection Page 13 Making the Dr...

Страница 4: ...es of H hARDNESS C unit CAPACITY and Bf bRINE FILL The remaining values that are already filled in are general standards for all softener sizes and hardness levels MASTER PROGRAMMING MODE To enter in...

Страница 5: ...t Unit Capacity listed on the table on page 7 With the front cover off of your control valve and while looking at the panel on the right side pull out and rotate the dial and line up your gallon capac...

Страница 6: ...7 1 to get Grains gpg Ex If your hardness is measured at 300 PPM take 300 17 1 18 gpg before iron 3 H Compensated Hardness Your Iron results should also be measured in either PPM or mg L Take your lev...

Страница 7: ...25 gpg 20K 5 Min 7 5 lbs Grid Grid NO GRID NO GRID 25 gpg 24K 7 Min 11 25 lbs Grid 3 Legs Grid Grid Grid 32K 1 0 cu ft 9x48 0 12 gpg 20K 4 Min 6 lbs Grid NO GRID NO GRID NO GRID TOO LARGE TOO LARGE 1...

Страница 8: ...ig u r e 8 a Fig u r e 8 b pre install ation Before assembly of your new system be sure that the following conditions have been met for the place ment of your system Level firm surface such as concret...

Страница 9: ...e 9 A Fig u r e 9 B 3 Installing the fleck 2510 sx t Valve 1 Remove the filling funnel and tape and while using the included silicone lubricant packet lu bricate the inner and outer o rings on the bot...

Страница 10: ...lines and use a wet rag on the lines being soldered to prevent heat damage during soldering 6 Once all connections have been made place the system into bypass by either using your existing 3 valve byp...

Страница 11: ...e the brine well and remove the cap You may also take this moment to prepare and insert the brine support grid determined from pages 6 and 7 Then pull the 474 Brine Float Assembly out of the brine wel...

Страница 12: ...e to recut the end of the tube each time you remove it to ensure a proper seal when the tube is inserted 8 Finally use inner diameter I D tubing to connect the drain barb fitting on the brine tank to...

Страница 13: ...ure 13 C Be sure that the fitting is fully inserted into the drain port by clicking it into place 4 Reinsert the drain fitting pin to lock the DLFC barbed drain fitting into the Fleck 2510 SXT con tro...

Страница 14: ...the UP or DOWN button as shown in Figure 14 B i Be careful to confirm the presence of the PM symbol in the top right corner You may hold the button to allow the time to scroll faster Once the time dis...

Страница 15: ...culated on pages 6 and 7 and press the REGEN button as shown in Figure 15 C 10 The display should now show H 20 This indicates the Hardness is 20 gpg i Use the UP or DOWN button to change this value t...

Страница 16: ...ll regenerate in 14 days if the meter has not measured water consumption to have reached the calculated capacity Do not change this value and press the REGEN button 14 The display should now show RT 2...

Страница 17: ...will now exit Master Programming mode and the display should now show the time of day followed by the number of gallons remain ing Now change the time of day to your current time with either the UP o...

Страница 18: ...leaks If you notice a leak originating from the drain line connection return to page 13 to review preparing the drain con nection If you notice a leak originating from the brine line connections retur...

Отзывы: