background image

PAGE 7

Help: 888-426-5001

QualityWaterForLess.com

5) 

 c - unIt caPacItY: 

 In the first column, identify the 

section

 containing your softener tank size and then within this 

section, find the 

row

 pertaining to your 

H - compensated Hardness

 level. Then look under the 

c - capacity

 column 

to find the most efficient program value to enter for your 

c - unit capacity

 and record it 

in the table on page 4 or 5.

 

note that your unit capacity program value may actually be lower than the tank’s rated capacity.

 This is to 

accommodate a lower salt dose for regeneration.

6) 

 BF - BrIne FIll: 

 

In the first column, identify the 

section

 containing your softener tank size and then within this 

section, find the 

row

 pertaining to your

 H - compensated Hardness

 level. Then look under the 

BF - Brine Fill

 column 

to find the most efficient program value to enter for your 

BF - Brine Fill

 and record it 

in the table on page 4 or 5.

 

7) 

 example: 

 If you ordered a 64K grain capacity system and have 28 gpg compensated hardness, you would look under 

the 64K, 2.0 cu ft section and then look under the 25+ gpg row for your particular programming values. Note that the 
11x11” and the 15x17” brine tanks are too small for the amount of brine needed to regenerate a 64K grain capacity system 
with 25+ gpg hardness. According to the table you would opt for an 18” diameter brine tank with a grid plus 6” legs

tank Size

HardneSS

caPacItY

BF 

BrIne FIll

lbs of Salt

11x11” Grid

15x17” Grid

18x33” Grid

18x40” Grid

24x41” Grid

24x50” Grid

24k 

0.75 cu ft 

8x44”

0 - 12 gpg

15K

3 Min

4.5 lbs

Grid

NO GRID

NO GRID

NO GRID

TOO 

LARGE

TOO 

LARGE

12 - 25 gpg

20K

5 Min

7.5 lbs

Grid

Grid

NO GRID

NO GRID

25+ gpg 

24K

7 Min

11.25 lbs

Grid + 3” Legs

Grid

Grid

Grid

32k 

1.0 cu ft 

9x48”

0 - 12 gpg

20K

4 Min

6 lbs

Grid

NO GRID

NO GRID

NO GRID

TOO 

LARGE

TOO 

LARGE

12 - 25 gpg

27K

7 Min

10 lbs

Grid + 3” Legs

Grid

Grid

Grid

25+ gpg 

32K

10 Min

15 lbs

Grid + 6” Legs

Grid + 3” Legs

Grid

Grid

40k 

1.25 cu ft 

10x44”

0 - 12 gpg

25K

5 Min

7.5 lbs

Grid

Grid

NO GRID

NO GRID

TOO 

LARGE

TOO 

LARGE

12 - 25 gpg

34K

9 Min

12.5 lbs

Grid + 3” Legs

Grid

Grid

Grid

25+ gpg 

40K

13 Min

18.75 lbs

TOO SMALL

Grid + 3” Legs

Grid + 3” Legs

Grid + 3” Legs

48k 

1.5 cu ft 

10x48”

0 - 12 gpg

30K

7 Min

9 lbs

Grid + 3” Legs

Grid

Grid

Grid

TOO 

LARGE

TOO 

LARGE

12 - 25 gpg

41K

10 Min

15 lbs

Grid + 6” Legs

Grid + 3” Legs

Grid

Grid

25+ gpg 

48K

15 Min

22.5 lbs

TOO SMALL

Grid + 6” Legs

Grid + 3” Legs

Grid + 3” Legs

64k 

2.0 cu ft 

12x52”

0 - 12 gpg

40K

8 Min

12 lbs

Grid + 3” Legs

Grid

Grid

Grid

Grid + 

5” Legs

Grid + 

5” Legs

12 - 25 gpg

54K

14 Min

20 lbs

TOO SMALL

Grid + 6” Legs

Grid + 3” Legs

Grid + 3” Legs

25+ gpg 

64K

20 Min

30 lbs

TOO SMALL

TOO SMALL

Grid + 6” Legs

Grid + 6” Legs

80k 

2.5 cu ft 

13x54”

0 - 12 gpg

50K

10 Min

15 lbs

Grid + 6” Legs

Grid + 3” Legs

Grid

Grid

Grid + 

5” Legs

Grid + 

5” Legs

12 - 25 gpg

68K

17 Min

25 lbs

TOO SMALL

Grid + 6” Legs

Grid + 3” Legs

Grid + 3” Legs

25+ gpg 

80K

25 Min

37.5 lbs

TOO SMALL

TOO SMALL

TOO SMALL

Grid + 6” Legs

96k 

3.0 cu ft 

14x65”

0 - 12 gpg

60K

12 Min

18 lbs

TOO SMALL

Grid + 3” Legs

Grid + 3” Legs

Grid + 3” Legs

Grid + 

6” Legs

Grid + 

6” Legs

12 - 25 gpg

81K

20 Min

30 lbs

TOO SMALL

TOO SMALL

Grid + 6” Legs

Grid + 6” Legs

25+ gpg 

96K

30 Min

45 lbs

TOO SMALL

TOO SMALL

TOO SMALL

TOO SMALL

120k 

4.0 cu ft 

16x65”

0 - 12 gpg

80K

16 Min

24 lbs

TOO SMALL

Grid + 6” Legs

Grid + 3” Legs

Grid + 3” Legs

Grid + 

8” Legs

Grid + 

8” Legs

12 - 25 gpg

108K

27 Min

40 lbs

TOO SMALL

TOO SMALL

TOO SMALL

TOO SMALL

25+ gpg 

120K

40 Min

60 lbs

TOO SMALL

TOO SMALL

TOO SMALL

TOO SMALL

Содержание Fleck 2510

Страница 1: ...v1 0 Fleck 2510 Metered Water Softener Install ation Guide...

Страница 2: ...s com We have put together these instructions as reference and to be used as general installation guidelines It is always recommended that a licensed plumber perform all instal lation work according t...

Страница 3: ...on and Filling the Tank Page 9 Installing the Fleck 2510 SXT Valve onto the Tank Page 10 Plumbing the Fleck 2510 SXT Valve into your Home Page 11 Making the Brine Tank Connection Page 13 Making the Dr...

Страница 4: ...es of H hARDNESS C unit CAPACITY and Bf bRINE FILL The remaining values that are already filled in are general standards for all softener sizes and hardness levels MASTER PROGRAMMING MODE To enter in...

Страница 5: ...t Unit Capacity listed on the table on page 7 With the front cover off of your control valve and while looking at the panel on the right side pull out and rotate the dial and line up your gallon capac...

Страница 6: ...7 1 to get Grains gpg Ex If your hardness is measured at 300 PPM take 300 17 1 18 gpg before iron 3 H Compensated Hardness Your Iron results should also be measured in either PPM or mg L Take your lev...

Страница 7: ...25 gpg 20K 5 Min 7 5 lbs Grid Grid NO GRID NO GRID 25 gpg 24K 7 Min 11 25 lbs Grid 3 Legs Grid Grid Grid 32K 1 0 cu ft 9x48 0 12 gpg 20K 4 Min 6 lbs Grid NO GRID NO GRID NO GRID TOO LARGE TOO LARGE 1...

Страница 8: ...ig u r e 8 a Fig u r e 8 b pre install ation Before assembly of your new system be sure that the following conditions have been met for the place ment of your system Level firm surface such as concret...

Страница 9: ...e 9 A Fig u r e 9 B 3 Installing the fleck 2510 sx t Valve 1 Remove the filling funnel and tape and while using the included silicone lubricant packet lu bricate the inner and outer o rings on the bot...

Страница 10: ...lines and use a wet rag on the lines being soldered to prevent heat damage during soldering 6 Once all connections have been made place the system into bypass by either using your existing 3 valve byp...

Страница 11: ...e the brine well and remove the cap You may also take this moment to prepare and insert the brine support grid determined from pages 6 and 7 Then pull the 474 Brine Float Assembly out of the brine wel...

Страница 12: ...e to recut the end of the tube each time you remove it to ensure a proper seal when the tube is inserted 8 Finally use inner diameter I D tubing to connect the drain barb fitting on the brine tank to...

Страница 13: ...ure 13 C Be sure that the fitting is fully inserted into the drain port by clicking it into place 4 Reinsert the drain fitting pin to lock the DLFC barbed drain fitting into the Fleck 2510 SXT con tro...

Страница 14: ...the UP or DOWN button as shown in Figure 14 B i Be careful to confirm the presence of the PM symbol in the top right corner You may hold the button to allow the time to scroll faster Once the time dis...

Страница 15: ...culated on pages 6 and 7 and press the REGEN button as shown in Figure 15 C 10 The display should now show H 20 This indicates the Hardness is 20 gpg i Use the UP or DOWN button to change this value t...

Страница 16: ...ll regenerate in 14 days if the meter has not measured water consumption to have reached the calculated capacity Do not change this value and press the REGEN button 14 The display should now show RT 2...

Страница 17: ...will now exit Master Programming mode and the display should now show the time of day followed by the number of gallons remain ing Now change the time of day to your current time with either the UP o...

Страница 18: ...leaks If you notice a leak originating from the drain line connection return to page 13 to review preparing the drain con nection If you notice a leak originating from the brine line connections retur...

Отзывы: