background image

 18 

 

 

 

 

                        7061-197I 

 

 

 

         December 3, 2015

Explorer II Medium Wood Stove

CAUTION

THE STRUCTURAL INTEGRITY OF THE MOBILE HOME 
FLOOR, WALL AND CEILING/ROOF MUST BE MAINTAINED

Do NOT cut through:
•  Floor joist, wall, studs or ceiling trusses.
•  Any supporting material that would affect the structural integ-

rity.

Asphyxiation Risk. 

NEVER INSTALL IN A SLEEPING ROOM.

Consumes oxygen in the room.

WARNING

You must use a Quadra-Fire Outside Air Kit Part 
OAK-ACC for installation in a mobile home.

1.  An outside air inlet must be provided for combustion.

2.  Appliance must be secured to the mobile home structure 

by bolting the legs to the fl oor.  

3.  Appliance must be grounded with #8 solid copper 

grounding wire or equivalent and terminated at each end 
with N.E.C. approved grounding device.

4.  Appliance must be installed with an approved UL103 HT 

ventilated chimney connector, UL103 HT chimney, and 
terminal cap with spark arrestor.  Never use a single wall 
connector (stove pipe) in a mobile home installation.  Use 
only double-wall connector pipe, Dura-Vent DVL, Selkirk 
metalbestos DS or Security DL double-wall connector or 
any listed double-wall connector pipe.

5.  In Canada, this appliance must be connected to a 6 inch 

(152mm) factory-built chimney conforming to CAN/ULC-
629M, STANDARD FOR FACTORY BUILT CHIMNEYS. 

6.  Follow the chimney and chimney connector manufacturer’s 

instructions when installing the fl ue system for use in a 
mobile home.

7.  Maintain clearance to combustibles.

8.  Floor protection requirements must be followed precisely.

9.  Use silicone to create an effective vapor barrier at the 

location where the chimney or other component penetrates 
to the exterior of the structure.

NOTE:

  Offsets from the vertical, not exceeding 45°, are 

allowed per Section 905(a) of the Uniform Mechanical Code 
(UMC). Offsets greater than 45° are considered horizontal and 
are also allowed, providing the horizontal run does not exceed 
75% of the vertical height of the vent. Construction, clearance 
and termination must be in compliance with the UMC Table 
9C. This installation must also comply with NFPA 211.

NOTE:

 Top sections of chimney must be removable to allow 

maximum clearance of 13.5 feet (411cm) from ground level 
for transportation purposes.

10.  Burn wood only.  Other types of fuels may generate 

poisonous gases (e.g., carbon monoxide).

11.  If unit burns poorly while an exhaust blower is on in home, 

(i.e., range hood), increase combustion air.

12.  Installation shall be in accordance with the Manufacturers 

Home & Safety Standard (HUD) CFR 3280, Part 24.

Approved for USA Installation only!

Mobile Home Installation

Содержание EXPLRMED-PBK

Страница 1: ...Hearth Home Technologies recommends NFI certified professionals or technicians supervised by an NFI certified professional HOT SURFACES Glass and other surfaces are hot during operation AND cool down...

Страница 2: ...Canada NOT APPROVED FOR MOBILE HOME INSTALLATIONS IN CANADA 1 Important Safety Information 3 A Appliance Certification 3 B BTU Efficiency Specifications 3 C Mobile Home Approved USA ONLY 3 D Glass Spe...

Страница 3: ...tained The appliance must be properly grounded to the frame of the mobile home with 8 copper ground wire and chimney must be listed to UL103 HT or a listed UL 1777 full length six inch 152mm diameter...

Страница 4: ...with unit Do NOT Overfire If appliance or chimney connector glows you are overfiring Any such action that may cause a fire hazard WARNING Fire Risk Hearth Home Technologies disclaims any responsibilit...

Страница 5: ...pped or sealed Attic mounted duct work and air handler joints and seams taped or sealed Basement installations should be avoided WARNING Negative pressure can cause spillage of com bustion fumes soot...

Страница 6: ...arance Chimney meets recommended height requirements 14 16 feet Roof flashing installed and sealed Terminations installed and sealed Clearances Section 3 Pg 7 Combustible materials not installed in no...

Страница 7: ...19 1 2 26 3 4 Figure 7 1 Front View Figure 7 2 Side View 12 1 4 20 1 16 7 15 16 27 28 15 16 Figure 7 2 Top View 29 3 25 7 8 22 3 16 Figure 7 4 Side View with horizontal flue 3 Dimensions and Clearance...

Страница 8: ...1397 Explorer II 10 1 2 267 6 1 2 165 20 1 4 514 6 1 2 165 7 178 17 1 4 438 55 1397 MINIMUM CLEARANCES TO COMBUSTIBLE MATERIALS in inches Millimeters NOTE A C and F Dimensions are to the center of th...

Страница 9: ...ney should Install through the warm space enclosed by the build ing envelope This helps to produce more draft espe cially during lighting and die down of the fire Penetrate the highest part of the roo...

Страница 10: ...Minimum 3 ft 91cm Minimum Wall or Parapet Flat Roof E 2 10 3 Rule These are safety requirements and are not meant to assure proper flue draft This appliance is made with a 6 inch 152mm diameter chimne...

Страница 11: ...l black or 26 gauge blued steel or an approved air insulated double wall venting pipe Thimble A manufactured or site constructed device installed in combustible walls through which the chimney connect...

Страница 12: ...tside dimension frame from 2 x 2 framing lumber to fit into wall opening Inside opening of frame should be no less than 14 inch x 14 inch 356mm x 356mm Figure 12 1 4 Attach the wall spacer to the chim...

Страница 13: ...ctors must conform to each other to ensure a proper fit and seal Flue Gas Direction Crimped End Toward Appliance Secure pipe sections with a minimum of 3 screws Figure 13 2 Chimney Connector Stove Pip...

Страница 14: ...ry to install a floor protector Type I of a minimum of 3 8 inch 9 5mm thick metal clad millboard or equivalent a minimum of 16 inches 406mm in front of glass and 8 inches 203mm to both sides of the fu...

Страница 15: ...2 Phillips screw driver attach the flex adapter to the stove using 4 screws Figure 15 1 15 2 3 Floor Rear Installation Cut a 4 inch 102mm hole in outside wall or floor to accommodate outside air pipi...

Страница 16: ...lts securing blower onto outer wall of appliance 4 Place the bracket containing the snap disc and magnet under the bottom left rear corner See Owner s Manual for detailed operating instructions for th...

Страница 17: ...lips and convection chamber top 2 Phillips 2 Remove 1 bolt from each side of the flue transition and retrieve nuts attached to bolts 3 Turn flue transition to horizontal position Inspect rope gasketin...

Страница 18: ...6 inch 152mm factory built chimney conforming to CAN ULC 629M STANDARD FOR FACTORY BUILT CHIMNEYS 6 Follow the chimney and chimney connector manufacturer s instructions when installing the flue syste...

Страница 19: ...BK ACC Blower Control Box W Switch SRV7000 194 Y Component Pack 7033 051 Magnet Round SRV7000 140 Y Snap Disc Bracket Assembly 7033 036 Snap Disc 1 Convection Blower SRV230 0470 Y Speed Control Only R...

Страница 20: ...eration DO NOT DISCARD Please contact your Quadra Fire dealer with any questions or concerns For the number of your nearest Quadra Fire dealer log onto www quadrafire com CONTACT INFORMATION This prod...

Отзывы: