background image

Page  16

7022-122D

May 12, 2014

Castile Pellet Insert

C.  Full Reline With Vertical Outside Air  

Figure 16.1

Outside Air 

 Termination 

at 

 Chimney Top 

12” (305mm)  
min. below 

12” (305mm) 
min. above 

NOTE;  Use metal 
plate around 
exhaust vent pipe 
and seal all edges 
with non-flammable 
insulation such as 
mineral wool or 
ceramic.

Do not use high 
temperature caulk-
ing materials to seal 
any edge to prevent 
future serviceability

NOTE:  

Check clearances carefully for this type of 

installation to ensure adequate room for outside air 
venting.

Check building codes prior to installation.
•  Installation MUST comply with local, regional, state and 

national codes and regulations.

•  Consult local building, fi re offi cials or authorities having 

jurisdiction about restrictions, installation inspection, 
and permits.

CAUTION

NOTE:  

In Canada, only a full reline is allowed per 

ULC S628-93, ORD ULC C1482-M1990.

NOTE:  

In Canada this fi replace insert must be installed 

with a continous chimney liner of 6 inch (152mm) in 
diameter extending from the fi replace insert to the top 
of the chimney.  The chimney liner must conform to the 
Class 3 requirments of CAN/ULC-S635, Standard for 
Lining Systems for Existing Masonry or Factory-Built 
Chimneys and Vents, or CAN/ULC-S640, Standard for 
Lining Systems for New Masonry Chimneys.

Содержание CASTILEI-MBK

Страница 1: ...um clearances to com bustibles as specified Failure to comply may cause house fire Check building codes prior to installation Installation MUST comply with local regional state and national codes and...

Страница 2: ...ervicing Replace glass only with 5mm ceramic available from your dealer To start set thermostat above room temperature the stove will light automatically To shutdown set thermostat to below room tempe...

Страница 3: ...rt Standard Surround 20 21 G Surround Trim Set Econo 21 H Surround Cast Trim Set 22 I Log Set Placement 22 J Thermostat Installation 24 Section 8 Operating Instructions A Combustible Non Combustible 2...

Страница 4: ...ms any responsibility for and the warranty and agency listing will be voided by the below actions DO NOT Install or operate damaged appliance Modify appliance Install other than as instructed by Heart...

Страница 5: ...e the appli ance where there will be a clear passage for a factory built listed chimney through the ceiling and roof Installing an optional outside air kit would affect the loca tion of the vent termi...

Страница 6: ...haust equipment Ensure furnace and air conditioning return vents are not located in the immediate vicinity of the appliance Avoid installing the appliance near doors walkways or small isolated spaces...

Страница 7: ...ply most of the demands of the pellet appliance but consideration must be given to the total house demand House demand may consume the air needed for the appli ance It may be necessary to add addition...

Страница 8: ...meets the required minimum height 10 All labels have been removed from the glass door 11 Plated surfaces have been wiped clean if applicable 12 Thermostat or remote has been installed 13 A power outle...

Страница 9: ...View Figure 9 2 Side View 819mm 707mm 594mm 203mm 483mm 629mm 249mm 330mm 51mm Overall Size A B Metal Surround w Cast Trim STD 42 1 2 in 1080mm 30 in 762mm Metal Surround w Cast Trim LRG 48 in 1219mm...

Страница 10: ...ce To Exposed Section And Face Trim B Clearance To Combustibles UL and ULC Inches Millimeters A Top of Hopper Top Vent 2 0 51 Rear Vent 2 5 64 B Side of Hopper Top or Rear Vent 2 0 51 C Back of Hopper...

Страница 11: ...urers instructions for installation The original factory built zero clearance fireplace chim ney cap must be re installed after installing the approved chimney liner meeting type UL 103 HT requirement...

Страница 12: ...he appropriate size Ensure that the leveling bolt is positioned over the 2 x 4 before level ing the insert The fireplace must not be altered except for the exceptions listed below Do not removal the b...

Страница 13: ...tions when installing venting system WARNING B Venting Termination Requirements 1 Termination must exhaust above air inlet elevation It is strongly recommended that at least 60 inches 1524mm of vertic...

Страница 14: ...e vertical rise you can obtain in your system the better it will perform Horizontal vent runs can accumulate ash and will need to be cleaned more often Try to keep them as short as possible ONE 90 ELB...

Страница 15: ...S ONLY Illustrations diagrams are not drawn to scale Actual installation may vary due to individual design preference A Full Reline With Horizontal Outside Air Outside Air through Rear Wall Horizontal...

Страница 16: ...des prior to installation Installation MUST comply with local regional state and national codes and regulations Consult local building fire officials or authorities having jurisdiction about restricti...

Страница 17: ...to clearances to combustibles and floor protection requirements on pages 9 to 11 for listings to combus tibles and appropriate chimney systems 6 Use silicone to create an effective vapor barrier at t...

Страница 18: ...d run pipe through wall 5 Attach hose to outside termination cap with second hose clamp 6 Secure termination cap to outside surface 7 Secure trim ring to interior wall Tools Needed Phillips head screw...

Страница 19: ...ed tape that holds front and side trims to scissors has a powerful bonding adhesive Adjust ments are extremely difficult once trim has adhered to tape Do a dry run first without removing paper from ta...

Страница 20: ...st Trim Footer Panel Leg 1 Remove contents from box and lay on protective surface to avoid scratching the paint 2 Lay hearth support s front and sides face down Bend the tab down toward the inside 3 T...

Страница 21: ...set 5 Remove the cast sides before attaching the surround and trim Lift up the top to expose the thumb screws that secure the cast sides Remove the thumb screw and top bracket and then remove the cast...

Страница 22: ...break them apart e Each clip has a clearance notch to allow room for the cast on the boss Place the clips over the boss so that the notch is facing the outer edge of the surround Figure 23 3 on page 2...

Страница 23: ...ure 23 1 3 Lean the logs against the cast iron brick in the back of the firebox 4 Push the logs to the far left and far right against the sides of the firebox Figure 23 2 5 To clean the logs use a vac...

Страница 24: ...cu rate readings The thermostat should be mounted on an inside wall and not in direct line with the appliance convection air Remove any packaging from inside the thermostat before using NOTE If the th...

Страница 25: ...e grain dust must be screened by sifting with 3 16 4 76mm inch mesh screening Do not use corn that contains additives such as oils or meals or has been chemically treated with pesticides It will void...

Страница 26: ...on instructions 2 Double check that the ash drawer and firebox are empty 3 Close the front door CAUTION Tip of thermocouple must be in contact with the inside end of the thermocouple cover Missed igni...

Страница 27: ...est setting The red call light will be on which is located on the top of the junction box behind the right access panel This indicates the thermostat is calling for heat Figure 27 1 4 The fuel feed sy...

Страница 28: ...ck side of Firepot Firepot floor left open ISSUES SOLUTIONS 1 Metallic noise 1 Noise is caused by metal expanding and contracting as it heats up and cools down similar to the sound pro duced by a furn...

Страница 29: ...firepot Firepot clean out plate not closed Firepot is dirty missed ignition Check that firepot clean out plate is fully closed Clean firepot Make sure there is no clinker in the firepot See page 32 Cl...

Страница 30: ...g loss of vacuum Empty hopper of fuel Use a wet dry vacuum cleaner to remove remaining fuel from hopper including feed tube Check feed chute for obstructions Loosen 2 screws and jiggle feed assembly C...

Страница 31: ...ick panels Change fuel brand to pre mium Check that firepot clean out plate is fully closed Reduce feed rate using feed rate adjustment control rod located inside hopper Nuisance shutdowns Low flame S...

Страница 32: ...ow Cleaning or Inspection Frequency Daily Weekly Monthly Yearly Ash Pan Every 5 bags of fuel depend ing on the fuel type or ash build up OR X Ash Removal from Firebox Every 5 bags or more fre quently...

Страница 33: ...bags or more frequently depending on ash build By Homeowner Locate the ash drawer underneath the firepot and slide the ash drawer straight out Empty into a non combustible container and re install ash...

Страница 34: ...clear view of the firepot is obscure By Homeowner a Appliance must be completely cool before cleaning glass b Vacuum fly ash from the glass and door rope c Use a damp paper towel or any non abrasive g...

Страница 35: ...Allow the appliance to completely cool down 2 Empty the hopper of any remaining pellets 3 Vacuum the hopper and feed tube 14 Preparing Firebox for Non Burn Season Frequency At the end of the heating...

Страница 36: ...the firepot By Homeowner Poor quality pellet fuel or lack of maintenance can create conditions that make the firepot fill quickly with ashes and clinkers This condition makes the appliance susceptible...

Страница 37: ...ss are purple white and the wires from the blower are black 6 The blower is held in place with a wing screw 7 Re install in reverse order E Combustion Blower Replacement 1 If you have adequate clearan...

Страница 38: ...he igniter wires are clear of any movement i e ash drawer firepot cleaning rod cleaning slide plates etc 5 Re install the ash drawer and then re install the side panel and re connect the power 1 Open...

Страница 39: ...not completely cover the top of the firebox There is an opening on the left as shown in Figure 40 5 on page 40 NOTE Improper installlation can cause poor appli ance performance Tabs Figure 39 4 Figur...

Страница 40: ...2014 Castile Pellet Insert Figure 40 2 Hook on left side Tab on right side Figure 40 3 Figure 40 4 Figure 40 5 Lift brick pull forward at an angle and drop down into notches Figure 40 1 Re installing...

Страница 41: ...e cover ceramic protection tube The thermocouple sends a millivolt signal to the control box indicating the preset temperatures of the green and red lights When describing the location of a component...

Страница 42: ...r Call Light Snap Disc 3 Reset Button Fuse Snap Disc 1 Exhaust Blower Convection Blower Vacuum Switch Snap Disc 2 Capacitor Feed Motor Yellow Blue Gray Black Black Black Black Black White White Red Re...

Страница 43: ...s Figure 43 2 Figure 43 3 RIGHT SIDE Control Box Junction Box Reset Button Heat Output Switch Power Cord Outlet Thermostat Block Fuse Red Call Light R ed G reen Am ber Light Blue Light Firepot Cleanin...

Страница 44: ...rt Castile Insert B CASTILEI MBK CASTILEI PMH CASTILEI CSB CASTILEI CWL Part number list on following pages Beginning Manufacturing Date Feb 2011 Ending Manufacturing Date Active 1 2 3 4 8 9 7 6 5 10...

Страница 45: ...ss Assembly Side 1 Piece 5 7 8 in W x 9 in H Interchangeable 414 5380 Y Gasket Channel 1 8 x 1 1 4 10 Ft 7000 377 10 Y 8 Backer Side Window Interchangeable 414 0280 9 Door Hinge Assembly SRV7022 012 H...

Страница 46: ...16 10 Ft 240 0290 10 Y Tape Door Corner SRV7027 227 Y 23 6 Retainer Rope 7001 192 Y 24 Vacuum Switch SRV7000 531 Y 25 Corner Post SRV7022 104 26 Bolt GRD 2 Tap 3 8 x 4 223 0140 27 Snap Disc 110 20 SR...

Страница 47: ...r SRV7058 148 34 Snap Disc 2 SRV7000 268 Y 35 Snap Disc Manual Reset 3 SRV230 1290 Y 36 Blower Convection 812 4900 Y 37 Feed Adjustment Plate SRV7022 119 38 1 Firepot Pull Rod Assembly 414 5270 Y Spri...

Страница 48: ...CHUP CWL Power Cord 812 1180 Y Harness Thermostat Wire 230 0810 Fuse 7 Amp Junction Box Pkg of 10 812 0380 10 Y Hose Vacuum 5 32 Id 3 Ft SRV240 0450 Y Magnetic Switch 7000 375 Y Wire Harness Hopper Sw...

Страница 49: ...CSTLI4834 CM Thermostat Mechanical 812 3760 Thermostat Programmable 811 0520 Trim Cast Matte Black 811 0930 Footer Left 414 7090MBK Footer Right 414 7100MBK Header 414 7110MBK Trim Leg Left 414 7120MB...

Страница 50: ...apped Push 1 4 Pkg of 24 7000 157 24 Y Nut Ser Flange Small 1 4 20 Pkg of 24 226 0130 24 Y Nut Wing 8 32 Pkg of 24 226 0160 24 Y Screw Flat Head 1 4 20 Pkg of 24 7000 130 24 Y Screw 1 4 20X3 8 Phillip...

Страница 51: ...May 12 2014 7022 122D Page 51 Castile Pellet Insert Date of Service Performed By Description of Service E Service And Maintenance Log...

Страница 52: ...Page 52 7022 122D May 12 2014 Castile Pellet Insert Date of Service Performed By Description of Service E Service And Maintenance Log Cont d...

Страница 53: ...May 12 2014 7022 122D Page 53 Castile Pellet Insert F Homeowner s Notes...

Страница 54: ...the case of new home construction warranty coverage begins on the date of first occupancy of the dwelling or six months after the sale of the product by an independent authorized HHT dealer distribut...

Страница 55: ...HDWLQJ DSSOLDQFH VRPH FKDQJHV LQ FRORU RI LQWHULRU DQG H WHULRU VXUIDFH ILQLVKHV PD RFFXU 7KLV LV QRW D IODZ DQG LV QRW FRYHUHG XQGHU ZDUUDQW DPDJH WR SULQWHG SODWHG RU HQDPHOHG VXUIDFHV FDXVHG E ILQJ...

Страница 56: ...e following patents United States 6830000 and 5582117 or other U S and foreign patents pending We recommend that you record the following pertinent information for your CASTILE PELLET INSERT Date purc...

Отзывы: