background image

B1

Accessories per 

module

People

Tools supplied

Accessories per column

Accessories per 

locker facility

x 2

x 2

Stacking and numbering rules 

Module types

Type 3S

Type L+XS

Type 2M

Assemble the modules in the order defined in your installation 

plan (lockers are numbered from top to bottom and from left to 

right).

A1

Bottom

A2

B3

Locker 1

Locker 7

Locker 8

Locker 10

Locker 11

Locker 21

Locker 20

Locker 24

Maximum modules per column = 4

Position 4

Position 1

Position 2

Position 3

Position 4

Position 1

Position 2

Position 3

Module 

type [L+XS] 

prohibited

Bottom

Back

Transport wedges

Push the module towards the back until it stops.

x 2

Remove the transport wedges from underneath 

the module.

Type C LR14 alkaline 

batteries

Locker labels

x 4

Caps

x 4

Feet

x8

[B]

x 8

Feet fixing 

screws

d

x 2

Clips

Service door key  

Place the foot fixing screws 

(b)

 in the holes of the foot 

(a)

.

Back

Type 4XS

x 2

Feet connectors

Cleaning 

wipes

Spanner

g

Recommended batteries: 

Duracell Pro

A7

If there is going to be a column adjoining 

this one, use the feet connectors 

(e)

.

A8

Repeat steps 

A1

 to 

A7

 for the 

other position 1 modules.

A3

Screw the foot in fully.

A4

Repeat steps 

A1

 to 

A3

 for the three remaining feet. Turn the module over and put it in its final 

location.

Bottom

Top

x 2

A5

Tighten the feet fixing screws with the service door key 

(f)

.

Ensure that the module is stable. If not, adjust the foot that is not 

in contact with the floor using the spanner 

(g)

.

A6

g

Stacking of 

position 2/3/4 

modules

Position 4

B

Position 3

Position 2

Position 1

B2

Bottom

Top

x 2

Turn the module over then place it on top of the 

module below.

Preparing position 1 

modules 

Position 4

A

Position 3

Position 2

Position 1

Parcel Pending Lite 

Hardware Installation Guide

Отзывы: