Safety Requirements
1.1
Power Connection
Before connecting, check whether the mailing system is suitable for the local AC power
voltage (230V - 50Hz).
THIS SYSTEM MUST BE GROUNDED
• Only connect the power plug to an socket provided with
a protective ground contact.
• To reduce the risk of fire, use only the power cord supplied
with the mailing system.
• Do not use ground adaptors.
• Do not use this product on a wet floor or near water.
• In case of liquid spillage, disconnect the power cord from
the socket and proceed with cleaning.
• Use an socket located near the system that is easily accessible. Do not route the
power cord between pieces of furniture or over sharp edges.
• Avoid using sockets controlled by wall switches or shared by other equipment.
• Make sure there is no strain on the power supply cord.
Compliance
Energy Star® Compliance
Your mailing system is Energy Star® compliant, meaning that it will help to save energy
and money while protecting the environment.
3
| Page 3 | | Jun-22-2021 11:01 |
1
Safety
information
Содержание IX-7
Страница 1: ...User Guide iX 7 Franking Machine ...
Страница 5: ... Page 4 TOC Jun 22 2021 11 01 ...
Страница 7: ......
Страница 15: ......
Страница 17: ......
Страница 107: ......
Страница 109: ......
Страница 123: ......
Страница 125: ......
Страница 194: ...3 The current account number is displayed 6 Accounts and Access Control 189 Page 189 Jun 22 2021 11 01 ...
Страница 195: ......
Страница 197: ......
Страница 205: ......
Страница 221: ...Content 216 Page 216 Jun 22 2021 11 01 8 Reports ...
Страница 227: ......
Страница 229: ......
Страница 235: ...2 Call is complete 230 Page 230 Jun 22 2021 11 01 9 Online Services ...
Страница 240: ...3 After a successful connection the display shows Press OK 9 Online Services 235 Page 235 Jun 22 2021 11 01 ...
Страница 274: ...Geodesic map 10 Configuring your Mailing System 269 Page 269 Jun 22 2021 11 01 ...
Страница 275: ...Geodesic codes 270 Page 270 Jun 22 2021 11 01 10 Configuring your Mailing System ...
Страница 286: ...5 Press OK to confirm to delete the job memory 10 Configuring your Mailing System 281 Page 281 Jun 22 2021 11 01 ...
Страница 297: ......
Страница 299: ......
Страница 329: ......
Страница 348: ...3 Select Update registration 4 Press OK to begin the procedure 12 Maintaining 343 Page 343 Jun 22 2021 11 01 ...
Страница 355: ......
Страница 371: ......
Страница 380: ...A0139564 B 22 06 2021 ...