Maintenance Processes
10.4
Maintenance process details
The maintenance processes listed below are only to be completed on request from by
Customer Service.
Check that your Mailing System is connected to the LAN or modem before starting.
As supervisor (see
on page 130):
Press
and select the path:
Maintenance
Processes
1.
Remove the Base
- Remove the base from service.
- Prepares the base for removal by saving data on USB key.
2.
Withdraw the Meter
- Remove Meter from service.
- Requires a password from Customer Services to perform.
3.
Update Registration
- This procedure is used if you have changed your address.
- Contact your Customer Service to change your information then you will be
instructed to perform the update registration procedure.
Performing the Update Registration Procedure to Change
your Address
This procedure is to be used if you have changed address.
First contact your Customer Service to update your details, then you will be instructed
to perform the update registration procedure.
186
| Page 186 | Jul-24-2023 01:56 |
10
Maintaining
your
Mailing
System
Содержание IS-350
Страница 1: ...User Guide IS 350 Mailing Systems...
Страница 5: ...Page 4 TOC Jul 24 2023 01 56...
Страница 7: ......
Страница 15: ......
Страница 17: ......
Страница 31: ......
Страница 33: ......
Страница 67: ......
Страница 69: ......
Страница 77: ......
Страница 79: ......
Страница 95: ......
Страница 97: ......
Страница 111: ...Content 106 Page 106 Jul 24 2023 01 56 6 Reports...
Страница 123: ......
Страница 131: ......
Страница 145: ...3 Press OK to validate 140 Page 140 Jul 24 2023 01 56 8 Configuring your Mailing System...
Страница 151: ...Geodesic map 146 Page 146 Jul 24 2023 01 56 8 Configuring your Mailing System...
Страница 152: ...Geodesic codes 8 Configuring your Mailing System 147 Page 147 Jul 24 2023 01 56...
Страница 163: ......
Страница 165: ......
Страница 179: ......
Страница 193: ......
Страница 195: ......
Страница 203: ......
Страница 211: ...A0154022 A 24 07 2023...
Страница 212: ...A0154022 A 24 07 2023...