mailing
system base
feeding table
and moistener
catch tray
Mailing System Components :
weighing platform
(WP)
shelf
LAN cable
power cable
meter
ink cartridge
Lift the mailing system base
(a)
slightly on the left hand side and align the hooks to attach the
feeding table
(b)
. Attach the catch tray
(c)
to the right hand side of the mailing system base
(a).
5
2
Lift the cover of the mailing system
base
(a)
to reveal the meter
(h)
and ink
cartridge
(i)
bays.
Attach the weighing platform
(d)
and
shelf
(j)
to the top of the mailing system
base
(a).
6
Insert the WP connector
(e)
into the port on the rear of the mailing
system base
(a)
. Then connect the LAN cable
(f)
and power cable
(g)
to each side of the mailing system.
7
Turn on the mailing system base
(a)
using the
switch behind the power cable
(g)
and follow the
steps on screen.
8
IN-600 Series
Quick Installation Guide
Unpack all components from the box, remove packaging
and any transit tape.
1
Place the meter
(h)
into the meter bay and push slide in until it fits
securely into position.
3
Insert the ink cartridge
(i)
into the ink bay with the ‘TOP’ and ‘LOCK’ stickers
facing upwards. Push the ink cartridge
(i)
towards the back of the mailing
system until you hear a ‘click’. Close the cover.
4
Select LAN and press ‘OK’ to test connection type.
OK
Installation Process
1 LAN
9
Complete the declaration by following the steps on
screen.
Next
Installation Process
Press the ‘Next’ to start the
Online service
decliration.
10
Once back on the home screen, press the coins
button to add funds to the meter.
Amount
Postage available
$ 100.00
Enter amount:
$ 10
12
13
Your mailing system base is now ready to use.
Please turn this sheet over for your Quick Start Guide.
back of mailing system base
weighing platform
(WP) connector
It is recommended to follow screen
prompts to test ink alignment.
A C E G I K
B D F H J
Select letter with arrows
and press «OK»
Headset alignment
For more help with your installation, please visit:
kb.quadient.us/in600