background image

5

 

The order of construction is not important. However, a good principle to follow is to install the smaller 
components first, so that the larger ones do not prevent easy access.  

In the following photograph, all the resistors, capacitors, inductors, LM317LZ voltage regulator (3-pin TO92 
package), 74ACT08 chip, and 3.6V zener diode have been fitted. Be careful to ensure the correct 
orientation of the semiconductors (IC1, IC2, zener diode); also the electrolytic capacitors C3 and C4. The 
silk-screen legend on the PCB may be too small to read, so please refer to the parts placement diagram. 

 

 

Battery 

Correct orientation of the battery is particularly 
critical! Since the battery will already hold some 
charge when it arrives, you must ensure that it is 
NOT inserted into the PCB in the wrong way, even 
temporarily 

– since it would supply reverse power 

to the RF module and potentially damage it.  

The 3V rechargeable battery has two pins, that fit 
the holes on the board. The TOP of the battery, is 
the positive connection. This pin fits the hole 
labelled “+”. Please study the photograph to the 
right, showing the battery correctly installed on the 
board. 

When soldering the battery, please make it quick. Hot Lithium probably is not a good idea. 

Содержание QLG1

Страница 1: ...ll ups or capacitors 2 Antenna The QLG1 GPS receiver kit can be built with two antenna options either an on board patch antenna or an externally mounted active antenna with SMA connector The module ca...

Страница 2: ...ternal voltage regulation within the module The 74ACT logic family are perfect for the purposes of level conversion because the high voltage threshold specification for this family is below the 2 8V h...

Страница 3: ...ors C1 0 1uF ceramic marking 104 C2 0 1uF ceramic marking 104 C3 22uF electrolytic C4 22uF electrolytic C5 0 1uF ceramic marking 104 4 3 Semiconductors IC1 74ACT08 14 pin DIP chip IC2 LM317LZ voltage...

Страница 4: ...t could cause short circuits solder bridges to adjacent tracks Also look for joints where the solder has not correctly flowed into the joint i e adhered to the component lead and the PCB The QLG1 PCB...

Страница 5: ...be too small to read so please refer to the parts placement diagram Battery Correct orientation of the battery is particularly critical Since the battery will already hold some charge when it arrives...

Страница 6: ...component side of the board Additionally 2 x 3 header connection pads are provided in case you want to wire the LEDs to be mounted off board for example to fit into an enclosure or front panel header...

Страница 7: ...emote active antenna installation If you decide to use an external active antenna then do not install the supplied patch antenna Instead you can fit a SMA socket such as the one pictured here left Ins...

Страница 8: ...rge and easy to solder to The 6 way set of connections provides access to the full set of signals for general purpose use of this GPS receiver module Note that TXD is the serial data output of the mod...

Страница 9: ...in the constellation can take around 1 hour So it is quite normal for performance of a GPS module to improve during the first hour after power up in terms of number of tracked satellites etc Until al...

Страница 10: ...the QRP Labs YahooGroups forum if you have not already The forum members can provide support for any questions regarding issues and share your success stories too 9 Version History 0 10 Jun 2015 Firs...

Отзывы: