![QNAP TL-R1620Sdc Скачать руководство пользователя страница 17](http://html.mh-extra.com/html/qnap/tl-r1620sdc/tl-r1620sdc_user-manual_766675017.webp)
3. Hardware Installation
This section provides information on installing controllers, installing drives, connecting the JBOD enclosure
to a NAS or a server, hot-swapping redundant power supply units, and rail kits.
Removing a Controller
1. Power off the JBOD enclosure.
2. Disconnect the power cord from the electrical outlet.
3. Disconnect all cables and external attachments.
4. Remove the controller.
a. Loosen the screws
b. Pull the handle to pull out the controller.
QNAP JBOD Enclosure - TL-R1620Sdc User Guide
Hardware Installation
16