background image

0

 

 

Q-Motion Zigbee 

Programming Guide 

 

Integrating into Control 4 Automation System 

Whenever blinds are integrated into a Control4 automation system, there is no need 
to perform any programming or limit setting. Essentially the blinds will be installed and 
left for the automation integrator to commission and set the limits. 
 
Please do not try to manually operate the Roller Blind prior to Control4 integration, as 

the motor may exit its ‘pairing mode’. The 

Roller Blind will not function correctly and 

continue to jog for several minutes, indicting it has not been setup.   
 
If blinds are used as a standalone product (no Control4 automation system), please 
continue with the steps below. 

 

Setting up Q-Motion Zigbee without a Control 4 Automation 
Systems 

 
 
 
 
 
 
 
 

 

NOTE: Range Extender: Green LED will flash rapidly for 1 second when a device 
(Blind/Remote) joins the network 
 

Create a Network (Range Extender) 

 

 

Power the RANGE EXTENDER using the provided power supply (Should be 
centrally located to blinds) 

 

PRESS and HOLD the NETWORK button until the GREEN LED illuminates (Green 
LED illumination indicates the network is active) 

 

Add Remote to Network 

 

 

PRESS and HOLD the NETWORK button until the GREEN LED illuminates (Green 
LED illumination indicates the network is active) 

 

Pull battery tab from Remote 

 

Use a paper clip to PRESS the PROGRAM button on back of the remote (The 
channel LEDs will scroll back and forth when in program mode) 

 

PRESS any button on the remote to join network (Green LED will flash when 
remote joins the network) 

Отзывы: