
I
NSTALLING
H
ARDWARE
P
ROCESSOR
2-21
2.9 Processor
Removing the Processor
To remove the processor:
1. Pull the system out of the rack to disconnect from power.
2. Remove the top cover.
3. Remove the processor heat sink.
4. Push the locking lever down and in to unlock the load plate.
Figure 2-20.
Unlocking the locking lever
5. Push the release lever down and in to release the load plate.
Figure 2-21.
Unlocking the locking lever
Note:
All the instructions and images in this section are for illustration purposes only and may not
reflect the actual product.
CAUTION!
E
NSURE
ALL
POWER
IS
DISCONNECTED
FROM
THE
SYSTEM
BEFORE
PROCEEDING
.
WARNING!
The processor remains hot after the system has been powered down. Allow sufficient time to
cool before handling system components.
!
!
Содержание QuantaGrid Series
Страница 1: ...Version 1 0 QuantaGrid Series D51PH 1ULH Hybrid Scale Out High Computing Storage Server Service Guide...
Страница 7: ...VI Connectors Connectors 5 1 Mainboard 5 1 Connectors 5 1 Regulatory and Compliance Information...
Страница 56: ...INSTALLING AN OCP MEZZANINE BOARD INSTALLING HARDWARE 2 31...
Страница 78: ...BIOS CHECKPOINTS 3 21 b Error code POST Error MRC Fatal Warning Code One reset switch To trigger system reset...
Страница 79: ...BMC Chapter 4 This section provides information and key features of BMC Baseboard Management Controller...
Страница 155: ...This page left blank intentionally...
Страница 156: ...Connectors Chapter 5 This section provides guidance information for the position and configuration of con nectors...
Страница 159: ......
Страница 160: ......
Страница 161: ......
Страница 162: ......
Страница 163: ......
Страница 164: ......
Страница 165: ...A VCCI A A...
Страница 166: ...A VCCI A A...
Страница 167: ......