![Qcells Q.HOME CORE H Series Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/qcells/q-home-core-h-series/q-home-core-h-series_user-manual_3126337013.webp)
13
Power On/Off
4.3 Turning Off Q.HOME CORE
If the AC circuit breaker cannot remain switched on after commissioning (e.g. because
the new meter has not yet been installed), the DC switch on the hybrid inverter must
remain switched on to avoid deep discharge of the battery. Alternatively, the device can
also be switched off completely.
To turn off the Q.HOME CORE:
1
Turning off the battery DC switch.
2
Turning off the PV switch.
3
Turn off the AC circuit breaker in the junction box.
Note
After turning off the Q.HOME CORE, the DC and PV swiches can be locked for safety.
For details about locking the DC and PV swiched, see "16 Power Off" in the installation manual.
Содержание Q.HOME CORE H Series
Страница 1: ...USER MANUAL Q HOME CORE H4 H5...