background image

Installation and Operation Manual

 

         

 

           

 

           

 

        

 

 

Q

   

F

  ire – Fire Brigade Switch

 

 

1.3

GUARANTEE

We guarantee that the goods delivered by us have
the specified properties. The duration of guarantee
is 24 months, unless otherwise agreed in writing,
and is calculated from the registration of the Q

F

ire

system at Q3 Energie GmbH & Co. KG from the
authorized specialist company that carried out the
installation and connection of the Q

F

ire system. 

As   the   manufacturer   of   the   Q

F

ire   -   Fire   Brigade

Switch, we confirm that:

by turning the main switch S1 to position „0“ (=
off), the PV system (string lines) from the Q

F

ire

control box to the inverter is set power-free.

As   the   manufacturer   of   the   Q

F

ire   -  Fire  Brigade

Switch, we certify that:

the Q

F

ire - Fire Brigade Switch complies to the

valid norm IEC60947-3. 

1.4

DISCLAIMER OF LIABILITY

We explicitly state that all product liability and gua-
rantee claims are null and void:

1.

if the device has not been installed, connected
and approved by a specialist company (start-
up protocol).

2.

if the device is not installed/operated in accor-
dance   with   the   instructions   described   in   this
manual.

3.

if the device is operated outside of its intended
use, see chapter 1.5 INTENDED USE, page 5
and chapter  1.6 NON INTENDED USE, page
5

4.

if the device is operated outside of its specifi-
cation of CE conformity.

5.

if a defect that has occurred is not immediately
asserted in writing.

6.

when   opening   and  operating   the  device  in  a
faulty condition.

7.

if you have made your own attempts to repair. 

8.

when  using/installing  non-original spare  parts
and accessories.

9.

for damage due to overvoltage/lightning.

10.

for   damage   caused   by   liquids   (e.g.   flooding,
burst pipes).

11.

for mechanical damage and its consequential
damage   after   successful   installation   (start-up
protocol). 

12.

for damage caused by overuse (frequent swit-
ching of switch S1 not in accordance with the
application) or exposure to foreign bodies.

13.

for normal wear an tear.

14.

in case of optical defects.

15.

for damages due to force majeure of any kind.

Q3 Energie GmbH & Co. KG 

Phone

+49 (0)8341/9080 334

IA-BA_QFire _E_AS002_V1.0

Moosmangstr. 8

Status 

March 15, 2024

Page

4 | 28

87600 Kaufbeuren

Email

[email protected]

Our general terms of business are to be applied.

Germany

Web

www.q3-energie.de

Errors and changes reserved.

eh

alten.

Содержание QFire

Страница 1: ...according to IEC60947 3 Q3 Energie GmbH Co KG Phone 49 0 8341 9080 334 IA BA_QFire _E_AS002_V1 0 Moosmangstr 8 Status March 15 2024 Page 1 28 87600 Kaufbeuren Email info q3 energie de Our general term...

Страница 2: ...rgie GmbH Co KG Phone 49 0 8341 9080 334 IA BA_QFire _E_AS002_V1 0 Moosmangstr 8 Status March 15 2024 Page 2 28 87600 Kaufbeuren Email info q3 energie de Our general terms of business are to be applie...

Страница 3: ...oing ba sis As a result the illustrations dimensions technical data and general content listed below may change as a result of adaptation to new knowledge This manual is intended to help you to optima...

Страница 4: ...cor dance with the instructions described in this manual 3 if the device is operated outside of its intended use see chapter 1 5 INTENDED USE page 5 and chapter 1 6 NON INTENDED USE page 5 4 if the de...

Страница 5: ...n this document Usage installation of parts and accessories others than the manufacturer s original s Usage of the printer in non compliance to this manual Changes modifications not approved by Q3 Ene...

Страница 6: ...tion cable breakage of the control line PV system switched off fending off dangers from people animals buildings and objects When used as intended and installed properly and professionally the QFire s...

Страница 7: ...the control box LED SPD see chapter 2 3 1 LED STATUS INDICATION Figure 2 Overview function schematics Q3 Energie GmbH Co KG Phone 49 0 8341 9080 334 IA BA_QFire _E_AS002_V1 0 Moosmangstr 8 Status Marc...

Страница 8: ...ch are optionally available from Q3 Ener gie GmbH Co KG Delivery content overview see chapter 3 DELIVERY CONTENT page 16 Q3 Energie GmbH Co KG Phone 49 0 8341 9080 334 IA BA_QFire _E_AS002_V1 0 Moosma...

Страница 9: ...ion about QFire Cluster can be downloaded from our website www q3 energie de Figure 4 Overview interconnection of cluster control boxes 2 1 1 2 QFire LIVE The QFire system status can also be called up...

Страница 10: ...ndicator 10 or an emergency stop remote OFF 8 can be connected Figure 6 Control box No Description 1 LED Error red 2 LED SPD surge protective device red green 3 LED Power green 4 Main switch S1 positi...

Страница 11: ...ntrol box or preceding switch box es 6 Connector for control lines to further switch box es or for termination dongle 7 Insert for PE 8 LED Error red 9 LED SPD surge protective device red green 10 LED...

Страница 12: ...x Figure 12 Type plate switch box Q3 Energie GmbH Co KG Phone 49 0 8341 9080 334 IA BA_QFire _E_AS002_V1 0 Moosmangstr 8 Status March 15 2024 Page 12 28 87600 Kaufbeuren Email info q3 energie de Our g...

Страница 13: ...operation red red off Control lines interrupted or under voltage at the control lines QFire system partly not operating off off off QFire system OFF not operating Q3 Energie GmbH Co KG Phone 49 0 834...

Страница 14: ...2 1 OPTIONAL MONITORING OF OVERVOLTAGE SPD A surge protection device 3 Fig 8 page 11 is installed in each MPP tracker in the switch box These can optionally be monitored If none of the SPD modules has...

Страница 15: ...ly a status indicator potential free contact 10 Fig 6 or an emergency stop remote OFF 8 Fig 6 can be connected ex ternally In this way the switch off process can also be triggered exter nally for all...

Страница 16: ...complete and undamaged Be sure to remove all parts from the packaging Claims for damages caused during transport can only be asserted if the delivery service is notified immediately Please prepare a...

Страница 17: ...x Maximum string voltage 1500VDC at max 11 A or 1200 VDC at up to 15A per string 6 pieces of mounting ears pre assembled Connection of the 4 pin control cable on site via spring loa ded terminals cabl...

Страница 18: ...ure range of 15 C to 60 C must be maintained Direct sunlight as well as additional heating by e g machines should be avoided The switch boxes can be attached to the substructure frame under the PV mod...

Страница 19: ...h control box as well as switch box slaves with power supply must be connected to 230V AC With option surge protection device an appopriate grounding has to be installed 3 Check the system function as...

Страница 20: ...ector Within the delivery content 1 each Wieland plug RST08 incl allen key for lockable plug INFO A mounting instruction of the Wieland plugs can be downloaded from our website QFire PV Feuerwehrschal...

Страница 21: ...T REVERSE POLARITY String lines must maintain their assignment input to output Figure 15 Connections switch box Figure 16 Interconnection PV strings and surge protection device SPD Q3 Energie GmbH Co...

Страница 22: ...ng off at the same time Time shifted shutdown with de lay switching option 7 Now check the voltage on the inverters All strings up from the switch box right side see figure 16 page must be voltage fre...

Страница 23: ...mplete functional test must be carried out and documented annually At this the QFire system is switched off and all strings from the distance bet ween the QFire switch box es and inverter s must be vo...

Страница 24: ...es of right length and diameter QFire system can not be turned off with the control box main switch off 0 LED Power green QFire control box defective Deinstall control box Bridge the PV strings for co...

Страница 25: ...NFORMITY Q3 Energie GmbH Co KG Phone 49 0 8341 9080 334 IA BA_QFire _E_AS002_V1 0 Moosmangstr 8 Status March 15 2024 Page 25 28 87600 Kaufbeuren Email info q3 energie de Our general terms of business...

Страница 26: ...PLIANCE Q3 Energie GmbH Co KG Phone 49 0 8341 9080 334 IA BA_QFire _E_AS002_V1 0 Moosmangstr 8 Status March 15 2024 Page 26 28 87600 Kaufbeuren Email info q3 energie de Our general terms of business a...

Страница 27: ...rotection Power consumption approx 40 mA at 230 VAC 3 W string connected Rated voltage isolation 1 500 VDC System voltage max 1 500 VDC Switch voltage max at 15 A 1 200 VDC Control voltage 12 VDC 12 V...

Страница 28: ...ts of the public waste management authorities or at the take back points set up by manufacturers or distribu tors within the meaning of the Electrical and Electronic Equipment Act On the website of th...

Отзывы: