Installation and Operation Manual
Q
F
ire – Fire Brigade Switch
4.6
CONNECTION OF THE PV STRING LINES
Proceed as follows:
1.
Turn off the control box main switch OFF „0“.
2.
Connect PV strings to the MC4 plugs of the switch box(es), see figure 15:
- left – connection PV strings coming from PV modules
- right – connection to the inverter
DON’T REVERSE POLARITY! String lines must maintain their assignment input to output!
Figure 15: Connections switch box
Figure 16: Interconnection PV strings and surge protection device SPD