INSTALLATION AND

OPERATION MANUAL

Q.PEAK DUO XL-G9.3 / BFG and XL-G9.3 / BGT solar modules

Содержание Q.PEAK DUO XL-G9.3 / BFG

Страница 1: ...Valid for North America INSTALLATION AND OPERATION MANUAL Q PEAK DUO XL G9 3 BFG and XL G9 3 BGT solar modules...

Страница 2: ...operator are responsible for com pliance with all applicable statutory requirements and regulations The following regulations and standards must be upheld at all times during the installation operati...

Страница 3: ...e documents This installation manual is only valid in combination with the following technical information DOCUMENT TYPE Product data sheet Packaging and transport information MISUSE OR INCORRECT USE...

Страница 4: ...to 185 F Pull loads and push loads according to chapter 2 3 Mounting Options Test Load in accordance with IEC 61215 and Design Load 1 5 in accordance with UL 61730 Installation using a mounting struct...

Страница 5: ...NTION The loads in the table are related to the mechanical stability of the solar modules The mechanical stability of the mounting system including clamps screws washers etc has to be evaluated by the...

Страница 6: ...unt when deter mining the maximum number of modules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or defective in...

Страница 7: ...rizontally as shown NOTE Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANS...

Страница 8: ...lt from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire open circu...

Страница 9: ...DANGER Risk of fatal injury due to electric shock Electrical work may only be performed by qualified and skilled personnel see page 3 Ensure correct polarity Use solar cables for the connection at the...

Страница 10: ...The U S National Electrical Code addresses these issues in Article 250 Proper grounding is achieved by bonding all exposed non current carrying metal equipment to the appropriately sized equipment gro...

Страница 11: ...t Grounding Conductor Aluminum Frame Screw Stainless Steel Q CELLS solar modules are known for a long operating life and minimal maintenance effort and expense Dirt and grime are usually washed away b...

Страница 12: ...trum Center Drive Suite 1400 Irvine CA 92618 USA TEL 1 949 748 59 69 EMAIL inquiry us q cells com WEB www q cells us Subject to change without notice Q CELLS Installation manual solar modules Q PEAK D...