18
19
INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO L-G5.3/BF – Q CELLS
INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO L-G5.3/BF – Q CELLS
19
18
DANGER! Risk of fatal injury due to electric shock!
Ä
Be sure to maintain the time intervals as specified
by the inverter manufacturer between switching off
the inverter and beginning any further work.
DANGER! Risk of fatal injury due to electric shock!
Ä
Never plug or unplug the cable when under load.
Modules must not carry any current.
1.
Switch off the inverter.
OFF
EN
4 ELECTRICAL CONNECTION
4.2 ELECTRICAL INSTALLATION SAFETY
2.
Switch off the DC circuit breaker.
3.
Measure shutdown in DC String.
(no DC current flow).
4.
Disconnect plugs by the use of appropriate
and qualified tools of the manufacturer.
5.
When connecting the modules proceed in reverse
order.
DANGER! Risk of fatal injury due to electric shock!
Ä
Electrical work may only be performed by qualified
and skilled personnel (see page 3).
Ä
Ensure correct polarity.
Ä
Use solar cables for the connection at the junction
box outlet.
Ä
Use the same, inverter-compatible plugs.
Ä
Use minimum No. 12 AWG copper wires insulated
for a minimum of 90 °C for field connections.
NOTE! Module damage may occur!
Ä
Ensure that the cabling is not under mechanical stress
(Comply with bending radius of ≥ 2.36 in (60 mm)).
Ä
Ensure that the cables do not run between module
and mounting rail or structure (danger of pinch).
Ä
Do not connect modules with different orientations
or angles of inclination in the same string.
Ä
Ensure for a tight connection between the plugs.
Plugs click together audibly.
click
click
click
click
DANGER! Risk of fatal injury due to electric shock!
Ä
Ensure that all electrical components are in a
proper, dry, and safe condition.
SOLAR
4 ELECTRICAL CONNECTION
4.3 CONNECTION OF MODULES