background image

6

7

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G10.X – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G10.X – Q CELLS

Installation Site

Please note the following guidelines that apply to the installation 
site:

• 

Solar modules are not explosion-proof and are not suitable 
for use in explosive environments.

 

Ä

Do not operate solar modules near highly flammable gas and 
vapors (e.g. gas tanks, gas stations).

 

Ä

Do not install modules in enclosed space.

 

Ä

Do not install modules in locations where they may be sub-
merged in water (e.g. floodplains).

 

Ä

Do not use modules as a substitute for the normal roofing 
(e.g. modules are not watertight).

 

Ä

Do not install modules in close proximity to air conditioning 
systems.

 

Ä

Do not install modules above 4000 m (13120 ft) altitude 
above sea level.

 

Ä

Contact with saline water (e.g. spray water from the sea) and 
salt aggregation on the modules must be avoided.

 

Ä

Do not bring any chemical substance (e.g. oil, solvent etc.) 
into contact with any part of the panel. Only substances, 
which are released by Q CELLS, are allowed to be used during 
installation, operation and maintenance.

 

Ä

Any installation of modules on surfaces of water is prohibited. 
This includes installations on floating as well as pile-based 
platforms. Q CELLS may extend the coverage of its warranty 
to such installations, based on a case by case assessment of 
the system design and location. A prior written consent by 
the warrantor is required in any case.

The solar modules are designed for the following applications:

• 

Operating temperatures from –40 °C to +85 °C 

 

(–40 °F  to  +185 °F).

• 

Pull loads up to max. 4,000 Pa and push loads up to max. 
5,400 Pa (see chapter „Mounting Options“).

• 

Installation using a mounting structure for solar modules.

Prevention of Shadowing Effects

Optimal solar irradiation leads to maximum energy output:

 

Ä

For this reason, install the modules so that they face the sun.

 

Ä

Avoid shadowing (due to objects such as buildings, chimneys 
or trees).

 

Ä

Avoid partial shading (for example through overhead lines, 
dirt, snow).

Mounting Structure Requirements

The Modules shall be installed and operated on mounting structures 
that comply with any applicable laws and stipulations as well as 
with the following:

• 

Conform to the necessary structural requirements.

• 

Compliant with local snow and wind loads.

• 

Properly fastened to the ground, the roof, or the façade.

• 

Forces acting on the module are relayed to the mounting 
substructure.

• 

Ensures sufficient rear ventilation of the module.

• 

Avoid the usage of different metals to prevent contact corrosion.

• 

Allows for stress-free expansion and contraction due to 
temperature fluctuations.

 

Ä

Ensure that no additional forces are applied through the 
mounting system into the module except for the wind and 
snow loads. Additional forces and moments of torque at the 
mounting positions caused by torsions, displacements or 
vibrations in the mounting system are not allowed.

 

Ä

Ensure that the clamps and the mounting frame are com-
patible.

Clamp System Recommendations

Use customary clamps that satisfy the following requirements:

• 

Clamp  width:  ≥ 40 mm.

• 

Clamp height compliant with a 32 mm frame height.

• 

Clamp depth: 7-12 mm. (applicable for all CL clamping mounting 
options at section „2.3 Mounting Options“)

• 

Clamps are not in contact with the front glass.

• 

Clamps do not deform the frame.

• 

Clamps that satisfy the structural requirements based on the 
conditions of the installation site according to the applicable 
regulations and technical standards.

• 

Long-term stable clamps that securely affix the module to 
the mounting frame.

Module Orientation Requirements

• 

Vertical or horizontal installation is permitted.

 

Ä

Ensure that rain and melting snow can run off freely. No water 
accumulation.

 

Ä

Ensure that the drainage holes in the frame are not covered. 
No sealing.

75°

 

Ä

Maintain the permissible angle of inclination.

• 

Minimum angle of inclination: 3°

• 

Inclination angles above 75° may be limited 
by local regulations

 

Ä

Standing water on the modules glass needs to 
be avoided.

2  PLANNING

2.2  REQUIREMENTS

Fig. 2: 

External dimensions and components for 
Q.PEAK DUO ML-G10.2, Q.PEAK DUO ML-G10.4 
and Q.PEAK DUO BLK ML-G10.4

DETAIL A

16 mm

8.5 mm

24.5 mm

1088 mm

1879 mm

4 × Mounting slots (DETAIL A)

Frame

1045 mm

996 mm

32 mm

8 × Drainage holes

395.5 mm

EN

4 × Grounding points ø 4.5 mm

Label

1250 mm

1250 mm

For additional information see the relevant datasheet of the module provided at www.q-cells.com.

PRODUCT LINE

Q.PEAK DUO ML-G10.2

Q.PEAK DUO ML-G10.4
Q.PEAK DUO BLK ML-G10.4

Type

Q.ANTUM DUO Z

Monocrystalline PERC

Length

1879 mm

1879 mm

Width

1045 mm

1045 mm

Frame height

32 mm

32 mm

Area

1.96 m²

1.96 m²

Weight

22.0 kg

22.0 kg

Max. system voltage V

SYS

1500 V

1000 V

Max. reverse current

20 A

20 A

Permissible 

temperature range

–40 °C to +85 °C (–40 °F to +185 °F)

Junction box 

protection class

IP67 with bypass diode

Connector protection class

IP68

Fire rating based on ANSI / UL 

61730

C / Type  1

C / Type  2

Max. test load Push / Pull

1

5,400 Pa / 4,000 Pa

5,400 Pa / 4,000 Pa

Max. design load Push / Pull

1

3,600 Pa / 2,660 Pa

3,600 Pa / 2,660 Pa

Certificates

Quality Controlled PV by TÜV Rheinland; CE-compliant; IEC 61215:2016; IEC 
61730:2016; PV module classification: Class II; UL 61730

1

 Test and design load in accordance with IEC 61215:2016, depending on mounting options (see section „2.3 Mounting Options“)

2  PLANNING

2.1  TECHNICAL SPECIFICATIONS

Содержание Q.PEAK DUO BLK ML-G10

Страница 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO ML G10 X solar module series Valid for Africa Europe LatinAmerica South America ...

Страница 2: ...t operational safety hazardous goods and environmental protection Regulations and requirements specific to the system Any applicable laws and requirements in particular inter national country specific regional laws and stipulations governing the planning installation and operation of solar power systems and work on roofs Any valid international national and regional regulations governing work with...

Страница 3: ...requirements Other applicable documents In addition to this Manual following technical information are relevant DOCUMENT TYPE Product data sheet Packaging and transport information Fig 1 External dimensions and components for Q PEAK DUO ML G10 Q PEAK DUO ML G10 Q PEAK DUO BLK ML G10 Q PEAK DUO BLK ML G10 Q PEAK DUO ML G10 a Q PEAK DUO ML G10 a Q PEAK DUO BLK ML G10 a and Q PEAK DUO BLK ML G10 a DE...

Страница 4: ...ows for stress free expansion and contraction due to temperature fluctuations Ä Ensure that no additional forces are applied through the mounting system into the module except for the wind and snow loads Additional forces and moments of torque at the mounting positions caused by torsions displacements or vibrations in the mounting system are not allowed Ä Ensure that the clamps and the mounting fr...

Страница 5: ...G10 Q PEAK DUO BLK ML G10 Q PEAK DUO ML G10 a Q PEAK DUO ML G10 a Q PEAK DUO BLK ML G10 a Q PEAK DUO BLK ML G10 a INSTALLATION ON MOUNTING POINTS Q PEAK DUO ML G10 Q PEAK DUO ML G10 Q PEAK DUO ML G10 2 Q PEAK DUO ML G10 4 Q PEAK DUO BLK ML G10 Q PEAK DUO BLK ML G10 Q PEAK DUO ML G10 a Q PEAK DUO ML G10 a Q PEAK DUO BLK ML G10 a Q PEAK DUO BLK ML G10 a 300 450 EUROPE 20 100 CL5 CL2a 20 300 CL2b 20 ...

Страница 6: ... of the mounting system including clamps has to be evaluated by the system supplier The listed test load values have been determined with the following clamp parameters clamp width 40 mm and clamp depth 10 mm Ä The system installer is responsible for the determination of location specific load requi rements Ä Ensure that the connection cables of the junction box do not run between laminate and mou...

Страница 7: ...of reverse currents caused by module defects ground leaks or defective insulation Ä Ensure that the maximum reverse current load capacity indicated in the data sheet is met In order to limit reverse currents that may occur we recommend using the following safety options 1 Layout with a limited number of parallel connected strings Withoutundertakingfurthercurrentblockingmeasures amaximum of two mod...

Страница 8: ...te Module damage may occur Ä Never step on modules Ä Do not subject modules to any mechanical stress Ä Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT Danger Risk of fatal injury due to electric shock Ä Block off the installation zone Ä Keep children and unauthorized individuals away from the solar power system Danger Risk of fatal injury due to electric shock...

Страница 9: ...lt from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Ä Please be aware of that the entire open circuit voltage is active even at low levels of solar irradiation Ä Pleasefollowthevalidnationalregulationsandsafetyguidelines for the installation of electrical devices and systems Ä Please make sure to...

Страница 10: ...sonnel see page 3 Ä Ensure correct polarity Ä Use solar cables for the connection at the junction box outlet Ä Only interconnect connectors of the same type and manufacturer Ä Use minimum 4mm2 copper wires insulated for a minimum of 90 C for field connections Note Module damage may occur Ä Ensure that the cabling is not under mechanical stress Comply with bending radius of 60mm Ä Ensure that the c...

Страница 11: ...ght concentrators e g mirrors or lenses Ä Ensure that the cabling is not exposed and or hanging and is protected from dirt moisture and mechanical friction 4 ELECTRICAL CONNECTION 4 4 AFTER INSTALLATION Protective Grounding Ä The modules must be grounded in accordance with the local statutory regulations DANGER Risk of fatal injury due to electric shock Ä Do not attempt to fix any problems yoursel...

Страница 12: ... snow and ice carefully without force e g with a very soft broom Ä Do not scratch off dirt Ä Module cleaning has to be done by qualified personnel according to the state of the art and taking into account all relevant safety issues and general product properties e g but not restricted to electrical safety mechanical stability load limits depending on the actual mounting options chemical suitabilit...

Страница 13: ...e 17 21 06766 Bitterfeld Wolfen Germany TEL 49 0 34946699 23222 FAX 49 0 34946699 23000 EMAIL sales q cells com WEB www q cells com Subject to change without notice Q CELLS Installation manual solar modules Q PEAK DUO ML G10 X_2021 09_Rev04_EN ...

Отзывы: