68
Figure 7-8 Comm X PCB Lights
Link LED Operation and Signaling
•. The.Link.LED.remains.on.if.a.hardware.Ethernet.connection.is.found.
•. The.LED.is.off.if.there.is.no.hardware.Ethernet.connection.
•. There.are.no.flash.codes.for.the.Link.LED.
Activity LED Operation and Signaling
•. The.Activity.LED.(called.ACT.on.some.circuit.PCBs).flashes.to.indicate.the.presence.
of.internet.traffic.
•. There.are.no.flash.codes.for.the.Activity.LED.
Status LED Operation and Signaling
•. During.the.startup.sequence.the.Status.LED.is.on.solid.for.a.few.seconds,.then.flashes.
quickly.for.several.seconds.while.the.communications.device.looks.for.an.Internet.
connection.
•. After.a.few.seconds,.the.Status.LED.flashes.more.slowly.while.serial.communication.
is.established.with.the.inverter’s.main.processor.
•. Once.serial.communication.is.established,.the.Status.LED.should.remain.on.unless.a.
fault.occurs..
The Status LED will flash status codes if any problem is found.
•. Each.code.is.a.comprised.of.a.series.of.three.flashes,.followed.by.a.pause.
•. Each.flash.can.be.either.a.short.or.long.flash..A.short.flash.is.approximately.0.2.sec-
onds.and.a.long.flash.is.approximately.0.5.seconds.
•. The.pause.between.flashes.is.one.second.
Link Light
Activity Light
Status Light
Содержание PVP260kW
Страница 1: ...97 600100 24 B02 PVP260kW Inverter INSTALLATION OPERATION MANUAL ...
Страница 2: ......
Страница 4: ...ii ...
Страница 6: ...iv ...
Страница 8: ...vi ...
Страница 48: ...36 ...
Страница 62: ...50 ...
Страница 86: ...74 ...
Страница 87: ...75 Appendix C Mechanical Drawings Figure C 1 Mechanical Drawings APPENDIX C ...
Страница 88: ...76 Figure C 2 Mechanical Drawings ...
Страница 94: ...82 ...
Страница 96: ...84 ...
Страница 104: ...92 Notes ...
Страница 105: ......
Страница 106: ...PO Box 7348 Bend OR 97708 P 541 312 3832 www pvpowered com ...