4.2 Pre-Installation Inspection Steps
Before placing and installing the inverter, it should be inspected to identify possible
external and internal shipping damage. If a problem is identified during any of these
inspection steps please contact PV Powered’s Customer Service and Technical Support at
1-877-312-3832, or email [email protected].
Step 1: External Inspection
Inspect the shipping materials and inverter for any cosmetic or structural damage.
Specifically look for any structural damage or crushing of the base and doors. Confirm all
doors open freely and easily.
Step 2: Rear Magnetics Compartment
1.. Remove.the.large.cover.plates.on.the.back.of.the.inverter,.accessing.the.magnetics..
2.. Inspect.all.nine.connections.including.the.following:
•. Three.connections.into.the.inductor
•. Three.from.the.inductor.to.the.transformer
•. Three.exiting.the.transformer
For each connection check the integrity of the busbar connections and terminals.
Figure 4-1 Busbar Connection and Terminal
3.. Check.the.screens.at.the.bottom.of.this.compartment.for.damage.or.debris.
Figure 4-2 Screen Check
Содержание PVP260kW
Страница 1: ...97 600100 24 B02 PVP260kW Inverter INSTALLATION OPERATION MANUAL ...
Страница 2: ......
Страница 4: ...ii ...
Страница 6: ...iv ...
Страница 8: ...vi ...
Страница 48: ...36 ...
Страница 62: ...50 ...
Страница 86: ...74 ...
Страница 87: ...75 Appendix C Mechanical Drawings Figure C 1 Mechanical Drawings APPENDIX C ...
Страница 88: ...76 Figure C 2 Mechanical Drawings ...
Страница 94: ...82 ...
Страница 96: ...84 ...
Страница 104: ...92 Notes ...
Страница 105: ......
Страница 106: ...PO Box 7348 Bend OR 97708 P 541 312 3832 www pvpowered com ...